Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2005 | BUILDING PRE-SLAB | Approved | IVRS - Inspection :* | |
| 05/06/2005 | BUILDING PRE-SLAB | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MAINTAIN MINIMUM 3" CLEARANCE REBAR TO DIRT 2) PLAN CALLS FOR 21.3 ADDITION (OVER 25' AS BUILT) 3) WRAP ALL PLASTIC PLUMBING PIPE THAT WILL BE IN CONTACT WITH CONCRETE 4) MOVE GALVANIZED H20 PIPE FROM UNDER SLAB 5) STOPPED INSPECTION-INCOMPLETE |