Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) WATER TEST SANITARY AND GREASE WASTE THRU TO POINT OF CONNECTION TO BLDG SEWER OK 2) PIPE WRAPS OK 3) PROVIDE CLEANOUT FITTING IN VENT FROM GREASE TRAP |
|
| 07/20/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) 4" GREASE WASTE THRU ROOF TO STUB 3' OUTSIDE BLDG WATER TEST OK 2) WILL NEED TO VIEW INSTALLED GREASE TRAP WITH VENT, CLEANOUT PER PLAN AND TEST TO POINT OF CONNECTION OF EXISTING SEWER AT LATER DATE 3) CORRECTION MADE ON SANITARY SEWER DRAIN AT SOUTH END 4) CALL IN 03005 FOR PIPE WRAPS PRIOR TO CONCRETE POUR |
|
| 07/19/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST WASTE AND VENT THRU ROOF SANITARY DRAINAGE OK 2) CORRECT BACK PITCHED SECTION OF 4" AT PENETRATION THRU SOUTH WALL DOWN STREAM OF FLOOR CLEANOUT 3) PROVIDE TEST OF GREASE WASTE PRIOR TO COVERING IN BLDG 4) H20 PIPING IN WALL OVERHEAD OK |
|
| 07/18/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) P.M. NOT POSSIBLE, NO ACCESS TO BLDG. LOCKED 10:04 AM PLEASE HAVE ACCESS TO BLDG AT REINSPECTION |
|
| 07/11/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE CAREFULLY READ 1011.3 94 UPC FLOW CONTROL, LOOK AT THE PLAN AND LOOK AT YOUR INSTALLATION. ALL QUESTIONS TO BE DIRECTED TO ARCHITECT, AND REVISED PLAN APPROVED BY THE CITY 2) ABOVE GRADE PIPING NOT SUPPORTED 3) SEE NOTE #7 P-1 PLUMBING SPECS 4) SHOW STRUCTURAL CONDITION WHY FS ADJACENT TO HS IS HORIZONTALLY VENTED BELOW THE FLOOR RIM |