Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2006 | ENGINEERING - FINAL | Approved | ||
| 02/02/2006 | ENGINEERING - FINAL | Partial Approval | TEMP C OF O ONLY, PERMANENET C OF O NOT TO BE GIVEN UNTIL THE SITE WORK FOR PERMIT#T04BU02149 IS COMPLETED AND APPROVED. | |
| 11/14/2005 | ENGINEERING - FINAL | Partial Approval | TEMP C OF O APPROVED, PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION FOR PERMIT #T04BU2149 IS COMPLETED AND APPROVED AND THE SITE WORK IS 100% COMPLETED. | |
| 11/04/2005 | ENGINEERING - FINAL | Not ready for Inspection | NOT READY, PROVIDE A CONTINUOUS PEDESTRIAN CIRCULATION PATH FROM THE DEVELOPMENT TO THE RIGHT-OF WAY, PER COT, DEVELOPMENT STD 2-08.3.0. THE PEDESTRIAN PATHWAY MUST ALSO MEET ADA REQUIREMENTS FOR H.C. ACCESSABILITY. |