Inspection History Details
Inspection Status: Approved
Inspection History: LANDSCAPE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2007 | LANDSCAPE - FINAL | Approved | ||
| 01/17/2007 | LANDSCAPE - FINAL | Partial Approval | 1) OBTAIN/INSTALL COVERS FOR WATER METERS 2) 84" HEIGHT CLEARANCE REQUIRED FOR FRONT SIDEWALK. CONTACT G. WITTWER FOR CONSULTATION (TREE INTERFERENCE ABOVE SIDEWALK) 3) FINISH PAVERS AROUND CLEAN-OUTS (CENTRAL WALKWAY). 4) ADDITIONAL WATER HARVESTING REQUIRED AT STREET LANDSCAPE BORDER(S). CREATE BASINS AROUND TREES. 5) FINISH REAR SCREEN WALLS 6) REFUSE ENCLOSURE SCREENING REQUIRED 7) VERIFY WITH E.S. THAT REFUSE PICKUP IS OBTAINABLE. POTENTIAL CONFLICT WITH OVERHEAD UTILITIES. 8) HC ACCESS TO HERBERT STREET. |