Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2005 | PLUMBING - ROUGH, SOIL | Approved | 1) ALL CORRECTIONS HAVE BEEN MADE 2) OK TO BACKFILL TRENCH 3) BLDG SEWER IS OK FROM 6" AT CLEANOUT TO 60' DOWNSTREAM IS OK 4) OK TO BACKFILL BLDG SEWER UP TO THIS POINT FOR EGRESS |
|
| 09/27/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* REDLINES CORRECTLY SHOW HOW THE PIPE WAS INSTALLED BUT FAIL TO SHOW WHAT HAS BEEN DELETED. MAKE SURE YOUR ABBREVIATIONS ARE IN AGREEMENT WITH PLUMBING LEGEND & SYMBOLS.W/O? ALL PIPINGS TO BE INSTALLED AT 2 %GRADE. REMOVE ALL ROCK AND CALICHE AND SHADE PIPE WITH CLEAN FILL. | |
| 09/23/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |