| 01/24/2006 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 01/12/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED PLANS/PERMIT ON SITE FOR INSPECTION |
|
| 10/12/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) #4-18" HAIR PINS MISSING RETAINER (AROUND #8 VERTICALS) 2) 2 GARAGE FOOTINGS MISSING 3) NEED RETAINER WALLS COMPLETED WITHOUT INSPECTION-COMPLETELY REMOVD AND RE-EXCAVATE INSTALL NEW REBAR AND CALL FOR REINSPECTION ON FOOTINGS 4) OFF SET IN WALL AT GRADE CHANGE TO BE SUBMITTED AND APPROVED BY ENGINEER AND CITY PLAN CHECK 5) STOPPED INSPECTION |
|
| 06/27/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINER TO 42" HIGH OK TO GROUT AT ELEVATION CHANGE ACCROSS ENTIRE WIDTH OF HOUSE. NO MORE INSPECTORS WILL BE DONE UNTIL ALL RETAINER WALL PERMITS OBTAINED. & INSPECTIONS VERIFIED ON SAME | |
| 06/22/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WRAP ALL PLB. IN CONTACT WITH CONCRETE 2) OBTAIN PERMITS FOR RETAINER WALLS EAST AND SOUTH SIDES OF PROPERTY |
|
| 06/13/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
| 04/29/2005 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 04/19/2005 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) RETAINER FTG AT ELEVATION CHANGE ACCROSS ENTIRE WIDTH OF HOUSE |
|
| 04/15/2005 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PLANS/PERMIT ? |
|
| 04/11/2005 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED PER CONTRACTOR |