Permit: T05CM00370

Parcel: 111063970


Addresses:

2806 N EDITH BL

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
05/06/2005 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
04/06/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) SUBJECT TO APPROVED REVISED PLAN AND CALL ROUGH SOIL TO COMPLETE INSPECTION
2) PLEASE WRAP ABS IN SLAB AND CALL FOR INSPECTION
04/05/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
03/29/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
03/28/2005 PLUMBING - ROUGH, SOIL Denied - Inspection :
See detailed listing on site.| 999* PLAN NEED TO RETURN TO PLAN REVIEW NOTE: WASTE LINE TO TRAP ARM OF W.C NOT TO CODE. ALSO PLEASE WRAP ALL ABS IN CONCRETE SLAB. NEED TO CHECK GRADE ON 4" TRUNK.
03/25/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :* 1) PLBG ROUGH SOIL NOT TO CODE VENTING FOR SHOWER NOT TO CODE SEE NOTES # 3 & 7
03/22/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :* PLEASE SEE INSPECTION SHEET FOR 2806. NOT READY FOR INSPECTION CANNOT COMPLETE INSP. WITHOUT APPROVED REVISED PLANS.
03/22/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection FOR 2806 N EDITH BL- 1) PLEASE PROVIDE AN APPROVED AS BUILD LIVE DRAWING. 2) PLUMBING DRAWINGS INCOMPLETE AT THIS TIME. 3) CODE VIOLATION ON TRAP ARM TO W.C WASTE LINE FRO LAV RUN TO TRAP ARM. 4) NO GRADE ON 4? TRUNK LINE SEC. 708.0. 6) CHANGE OF DIRECTION HORIZONTAL PROVIDE APPROVED FITTING REMOVE SANTEE'S. 7) SEE CODE FOR CLEAN OUTS.
03/21/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :* CODE VIOLATION ON SANTEE IN HORIZONTAL PLEASE HAVE YOUR PLUMBER READ OVER SEC 706.3 94 UPC FOR HORIZONTAL LINES CONNECTING TO HORIZONTAL LINES. ALSO READ OVER SEC 712.2 ON WATER TEST 10' WATER TEST REQUIRED. ALSO HAVE YOUR APPROVED PLAN & PERMIT ON JOB AT TIME OF INSPECTION NO BODY ON JOB