Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 05/10/2006 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to address: 1- Complete HC parking. 2- Remove all construction debris. (straw, soil, fencing, ect.) 3- Backfill all open holes. 4- Install all wheel stops. 5- Turn downspouts next to door. 6- Fix holes in block wall. |
|
| 05/05/2006 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to address items: 1- Backfill along wall west side of building. 2- Separate construction activity from public access. 3- Stabilize area west side of block wall. |