Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T05CM00279
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* NOTE: CONTRACTOR WAITING FOR 25 AMP BREAKER AND IS TO BE INSTALLED ON INSTA-HOT WHEN IT ARRIVES ALSO, REMOVE TEMP SERVICE |
|
| 04/13/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. CHECK ALL PANEL DIRECTORYS MAKE SURE CORRECTLY IDENTIFIED -- NEC 408.4 2. CHECK EMERGENCY LIGHTING & OCCUPANCY SENSORS 3. CONDENSATE PUMPS TO BE ENERGIZED VIA A RECEPTACLE NOT CUT CORD END -- NEC 400.7B 4. PROVIDE PROPER CLEARANCE FOR DISCONNECTS NEC 110.26 5. NEED ACCESS TO PANEL "D" |