Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* PIPE WRAPS OK |
|
| 09/14/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST WASTE AND VENT UNDERGROUND (ONLY) TO 2' PAST NORTH EAST CORNER OF BLDG 2) WILL NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE POUR 3) WILL NEED TO VIEW CONTINUATION OF BLDG SEWER WITH TEST AND HCS CONNECTION |
|
| 09/09/2005 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE PROVIDE RED LINE DRAWING OF YOUR INSTALLATION 2) PROVIDE LONG RADIUS 90 DEGREE AT VERTICAL TO HORIZONTAL DRAINAGE AT NORTH WASHING MACHINE LOCATION 3) PROVIDE CLEAN SHADING MATERIAL FOR YOUR PIPING 4) PROVIDE FULL SIZE UPPER TERMINAL CLEANOUT ON 3" FOR SOUTH UNIT 5) COMPLETE 3" SEWER BETWEEN UNITS 6) SANTEE TO P-TRAP REQUIRES 2 TIMES PIPE DIAMETER FROM VENT TO WEIR OF P-TRAP TO PREVENT S-TRAP CONDITION |