Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/07/2005 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE AS PER LAST REQUEST . TESTING ON BACKFLOW DEVICE COMPLETE |
| 03/03/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* CORRECTIONS MADE FROM 2/25/05 1) PROVIDE INSTALLATION OF SODA DISPOSING EQUIPMENT. 1A PROVIDE SEPARATE BACKFLOW PROTECTION WITH CERTIFICATION FOR BACKFLOW DEVICES FOR CARBONATED AND NON CARBONATED BEVERAGES. 1B PROVIDE CORRECT DRAINAGE FOR SODA & ICE DISPENSING EQUIPMENT. 1C ICE TEA BREWER WILL REQUIRE BACKFLOW PROTECTION & CERTIFICATION. |
| 02/25/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1) PROVIDE SAFETY CABLES FOR EQUIPMENT UNSING NATURAL GAS THAT IS ON WHEELS. 2) ICE MACHINE WATER SUPPLY REQUIRES PROOF OF 1" AIRGAP ON WATER INLET OR BACKFLOW PROTECTION WITH CERTIFICATION. COPY TO BE TURNED INTO INSPECTOR. 3) ICE MACHINE DRAINS TO BE SEPERATE WITH 1" AIR GAP AT FLOOR SINK. 4) DRAIN FROM DISHWASHER NEEDS TO GRAVITY DRAIN. |
| 01/28/2005 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |