Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2010 | ELECTRIC - FINAL | Approved | ||
| 08/30/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/26/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/23/2005 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WILL NEED ACCESS INSIDE TO CHECK FOR FINAL 2) CHECKING WITH SUPERVISOR STEVE LONG TO ATTEMPT TO GET POWER TURNED ON FOR FINAL 3) ONCE POWER IS TURNED ON, RECALL AND HAVE HOUSE OPEN |
|
| 04/25/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NO PLANS/PERMIT VISIBLE 2) WILL NEED PERMIT FOR TEMP SERVICE 3) WILL NEED GFCI BOX ON BOTTOM OF ELECTRIC PANEL 4) INSTALLED WITH BREAKER AND ROMEX TO SAME |
|
| 04/13/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CANNOT DO ELECTRIC FINAL UNTIL ALL COUNTER TOPS ARE INSTALLED 2) NO POWER ON HOUSE 3) STOPPED INSPECTION |