Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/20/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) UNCOVER ALL UNDERGROUND PIPING 2) EXPOSE ABOVE GROUND GAS PIPING RUSTED-HAVE ENGINEERING CERTIFIED OR REPLACE 3) SECURE PIPING TO WALL 4) CANNOT HAVE GAS PIPING IN RETURN AIR PLENIUM 5) SUBMIT GAS DRAWING SHOWING ALL GAS APPLIANCE DEMANDS, LENGTH OF RUN SIZE OF PIPE, ETC... 6) STOPPED GAS INSPECTION |