Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 05/10/2005 | FRAMING | Partial Approval | IVRS - Inspection :* 1) PENDING STAIR DETAIL AND HEIGHT OF BLDG APPROVAL. CONTINUE AT OWN RISK 2) LATH OK FROM INSIDE |
|
| 05/06/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) DETAIL 34 S1-2 NOT PER PLAN 2) PROVIDE 1" CLEARANCE FROM COMBUSTIBLES AT B-VENTS 3) GAS TEST AT 3 PSI 4) FRAMING WILL BE APPROVED WHEN ALL TRADES ARE COMPLETE |
|
| 05/03/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SEAL AROUND PANEL AREA. 2) HORIZONTAL & VERTICAL JOINTS NOT TAPED ON AREAS. 3) STUD AT GARAGE WEST WALL OVER NOTCHED 4) BLOCK SHEER PANELS AT GARAGE. 5) PROVIDE 1" CLEARANCE FROM COMBUSTIBLES AT B-VENT. 6) FIRE BLOCK RIGHT SIDE OF GLB AT GARAGE. 7) NO TEST ON DWV ON WATER LINES. 8) PROVIDE STAIR DETAIL. STOPPED INSP TO MANY ITEMS. |