01/28/2008 | STORMWATER FOLLOW-UP INSP | Approved | CLOSED FILE AND ARCHIVEDT05BU02954 STOCKPILE PREMIT NOW COVERED BY GRADING PERMIT T06BU00854 |
|
03/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET ON SITE WITH MIKE BOWERS AND LEO CLARK INTRODUCED JOHN B |
|
10/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED 7 DAYS -SWEEP BILBY -UNCONTAINED WASHOUT AT LOT 583 AND NORTH -WASHOUT LOT 581 -WASHOUT LOT 582 |
|
07/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IN GOOD CONDITION NO CONCERNS |
|
06/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MIKE BOWER ON SITE NO CONCERNS AT THIS TIME SEDIMENT CONTROLS STAYED IN PLACE NEW SWPPP CONTRACTOR FOR THE SIERRA MORADO PROJECTS |
|
06/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | WORK HAS STOPPED WAITING ON GRADING PLAN APPROVAL CONTROLS IN PLACE |
|
06/12/2006 | STORMWATER FOLLOW-UP INSP | Approved | ALL SEDIMENT CONTROLS ARE IN PLACE TALKED TO BURT GRADING PERMIT SHOULD BE APPROVED ANYTIME NOW |
|
05/03/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1 SWEEP TRACK OUT 2 PROTECT ALL INLET STRUCTURES |
|
04/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT FROM T05BU01556 TO THIS STOCK PILE IS BEING ADDRESSED ROAD BROOM ON SITE AND RUNNING MY ONLY SUGGESTION IS TO ADD SEDIMENT CONTROLS TO ANY INLET SCUPPERS NO OTHER CHANGES TO SITE |
|
04/03/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT FROM T05BU01556 TO THIS STOCK PILE IS BEING ADDRESSED ROAD BROOM ON SITE AND RUNNING MY ONLY SUGGESTION IS TO ADD SEDIMENT CONTROLS TO ANY INLET SCUPPERS |