Permit: T05BU02883

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
05/15/2019 GRADING - INTERMEDIATE Approved THIS PERMIT HAS BEEN FINALED AT THIS TIME SINCE ALL WORK HAS BEEN COMPLETED IN THE PAST.
11/25/2008 GRADING - INTERMEDIATE Correction Required STORMWATER CONTROLS ARE DETERIORATING AND NEED MAINTENANCE.
THE STREETS ARE LACKING THE FINAL 2" ASPHALT OVERLAY

NO CONSTRUCTION AT THIS TIME.
THIS IS A 19 LOT SUBDIVISION. THERE ARE (7) UNBUILT LOTS, WITH (2) PARTIALLY CONSTRUCTED HOMES. ONE OF THE PARTIALLY CONSTRUCTED HOMES AT 7333 E VUELTA RANCH MESQUITE TAX PARCEL #114-476120 HAD A NOTICE OF TRUSTEE'S SALE DATED 7/1/08 WITH A SALE DATE OF 9/30/08

AMERICABUILT CONSTRUCTION INC.,
5255 E. WILLIAM CIRCLE #6000

BANK OF THE WEST
7225 N. ORACLE RD #202
TUCSON, BBC 21041
02/28/2007 GRADING - INTERMEDIATE Correction Required ALL LOTS ARE GRADED HOWEVER THE AS-BUILT PLAN IS NOT APPROVED BY C.O.T.
02/14/2007 GRADING - INTERMEDIATE Not ready for Inspection R/D BASIN HAS RECENT CONSTRUCTION THAT DOES NOT MATCH CURRENT UN-APPROVED AS-BUILT PLAN
02/02/2007 GRADING - INTERMEDIATE Approved AS BUILT REVIEW WITH MERWIN AT HIS OFFICE
01/31/2007 GRADING - INTERMEDIATE Correction Required CURRENT AS-BUILT PLAN DOES NOT ADDRESS ALL AS -BUILT CONDITIONS AND ELEVATIONS
01/30/2007 GRADING - INTERMEDIATE Not ready for Inspection MEETING WITH MERWIN YELLOWHAIR (241-5103) TO REVIEW THE STATUS OF THE AS-BUILT GRADING PLANS. WE DISCUSSED THE ELEVATIONS, RETAINING WALLS, SLOPE PROTECTION AND RETENTION/DETENTION BASIN.
I OBTAINED OF COPY OF THE PLANS THAT SHOWED THE REVISIONS. I WILL INSPECT THE SITE WITH THESE AS-BUILTS PRIOR TO APPROVAL BY PAUL MACHADO TO DETERMINE IF ALL ISSUES HAVE BEEN ADDRESSED.
12/06/2006 GRADING - INTERMEDIATE Denied SITE INSPECTION WITH JIM FEMLING.
R/D BASIN, RETAINING WALLS AND LOT ELEVATIONS ARE NOT CONSTRUCTED TO PLAN SPECS.
PHONE CONVERSATION WITH MERWIN: HE WILL REVISE AND RESUBMIT AS-BUILT/REVISED PLAN TO PAUL MACHADEO FOR APPROVAL. MERWIN WILL NOW BE THE ENGINEER OF RECORD.
12/05/2006 GRADING - INTERMEDIATE Denied SITE INSPECTION WITH PAUL MACHADO
R/D BASIN RETAINING WALLS NOT CONSTRUCTED PER PLAN
11/30/2006 GRADING - INTERMEDIATE Not ready for Inspection PHONE CONVERSATION WITH PAUL PZOMO REGARDING CONCERNS FOR R/D BASIN CONTRUCTION/PERCOLATION AND CROSS SECTION FOR ADJACENT PRIVATE STREET RE-PAVING OUTSIDE THE GRADING LIMITS.
11/29/2006 GRADING - INTERMEDIATE Not ready for Inspection MOST OF THE CURBING IS IN PLACE. THE BASE ASPHALT PAVING IS IN PLACE WITH THE EXCEPTION OF THE 2" TOPCOAT TO BE COMPLETED AT A LATER DATE. SIDEWALKS ARE UNDER CONSTRUCTION. DRAINAGE HAS NOT BEEN COMPLETED. SIDEWALK SCUPPERS HAVE NOT BEEN CONSTRUCTED. THE SMALL/DEEP RETENTION/DETENTION BASIN WALLS HAVE BEEN CONSTRUCTED, THE BOTTOM OF THE BASIN APPEARED TO BE COMPLETELY COVERED WITH CONCRETE AND MORTAR PRIOR TO THE ADDITION OF SOIL TO BRING TO FINISHED GRADE. I ALERTED DARLA, RON SHARP AND BILL KOCH THAT BASIN NEEDS TO DRAIN DOWN WITHIN 12 HOURS OF RAIN EVENT.