Permit: T05BU02853

Parcel: 14118001D


Addresses:

10220 E REES LP


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU02853

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
11/09/2006 STORMWATER FOLLOW-UP INSP Approved
08/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK SHOULD BE STARTED THIS WEEK
08/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval CURBING BEING INSTALLED
PAVING SHOULD START SOON
07/12/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CONCRETE/STUCCO/GROUT/DRYWALL AND PAINT ALL NEED TO BE WASHED OUT IN A DESIGNATED WASHOUT (PLACE WASHOUT)
2. CLEAN UP ALL CONCRETE WASHED OUT AROUND SITE
3. DROP INLET AT SW CORNER NEEDS TO BE CLEANED. DEBRIS ON GRATE. (VACTOR TRUCK FOR ENTIRE DRAINAGE)

THERE IS A GAP BETWEEN PIPE AND CB STRUCTURE PER DON DAR-HIL TO ADDRESS IT.
07/06/2006 STORMWATER FOLLOW-UP INSP Correction Required SOME TRACK OUT (MINOR) ONTO REES LOOP
06/29/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CATCHBASIN GRATE FILLED WITH LEAVES AND OTHER DEBRIS ON SOUTH SIDE OF PROJECT
2. NO STABILIZED CONSTRUCTION ENTRANCE-NO TRACK OUT AT THIS TIME
3. TRUNCATED DOMES TO BE PLACED AT ALL RAMP/VEHICULAR TRAFFIC AREAS
06/19/2006 STORMWATER FOLLOW-UP INSP Correction Required SEDIMENT CONTROLS NOT IN PLACE AT SOUTH CATCH BASIN
NO STABILIZED CONSTRUCTION ENTRANCE
06/09/2006 STORMWATER FOLLOW-UP INSP Correction Required -PROTECT CATCH BASIN SW CORNER W/ SEDIMENT CONTROLS
-PROTECT DROP INLET STRUCTURE W/ SEDIMENT CONTROLS AT THE NW CORNER OF PROJECT
-PER AGREEMENT WITH BOB DARBY A VACTOR TRUCK MUST BE USED TO CLEAN OUT NEW AND EXISTING DRAINAGEWAY/STRUCTURES
-RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCE
-PROVIDE SEDIMENT CONTROLS UNTIL ALL DISTURBED AREAS ARE STABILIZED
05/26/2006 STORMWATER FOLLOW-UP INSP Correction Required - PROTECT CATCH BASIN INLET ON N END OF DRAINAGEWAY WITH SEDIMENT CONTROLS
- PROTECT CATCH BASIN INLET ON S END OF DRAINAGEWAY WITH SEDIMENT CONTROLS
- USE A VACTOR TRUCK ON THIS NEW DRAINAGEWAY AND EXISITING DRAINAGE (WILL BE DONE BY DAR-HIL PER BOB DARBY) BEFORE ACCEPTANCE OF THIS PROJECT
- RE-ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE
05/22/2006 STORMWATER FOLLOW-UP INSP Correction Required SEDIMENT CONTROLS NEED TO BE PLACED AROUND LEAKING WATER METER
SCE NEEDS TO BE EXTENDED
WYATT WITH DAR-HIL IS IN CHARGE OF THE PAVING
05/09/2006 STORMWATER FOLLOW-UP INSP Approved SITE NEEDS MORE ROCK IN SCE
04/18/2006 STORMWATER FOLLOW-UP INSP Approved CERTIFIED MAIL RCVD
04/10/2006 STORMWATER FOLLOW-UP INSP Approved CONCRETE WASHOUT IN PLACE
SWPPP IN PLACE AND APPEARS TO BE WORKING
04/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval SILT FENCE HAS BEEN REPLACED
SIDEWALKS/R.O.W. HAS BEEN SWEPT
DRAINAGE TIE IN ON N END OF NEW DRAIN PIPE HAS BEEN CAUTION TAPED OFF
ROAD APPEARS TO HAVE BEEN SWEPT
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval 2 PHONE CONVERSATIONS REGARDING THIS SITE

SPOKE WITH SITE SUPER (DON) AND WAS ADVISED FIRE DEPT WAS BY TO TEST NEW HYDRANT 4/3

SPOKE TO JOHN WROKLAGE WITH DAR-HIL. DRAINAGE TIE IN SHOULD BE IN THE NEXT 2 WEEKS
03/30/2006 STORMWATER FOLLOW-UP INSP Correction Required DELIVERED NOV, PICTURES AND STORMWATER ORDINANCE TO DON WITH OKLAND AT THE JOB SITE
DELIVERED NOV, PICTURES AND STORMWATER ORDINANCE TO DAR-HIL AT DAR-HIL'S OFFICES. SPOKE WITH BOB DARBY REGARDING THE ISSUES AT THIS SITE AND ADVISED A STOP WORK ORDER AND CITATION WOULD ENSUE IF SITE WAS NOT SATISFACTORILY ADDRESSED BY RE-INSPECTION ON MONDAY APRIL 3.
03/29/2006 STORMWATER FOLLOW-UP INSP Correction Required NOTICE OF VIOLATION TO BE ISSUED.
SPOKE WITH JOHN WROKLAGE 3/28 WAS PROMISED SITE ISSUES WOULD BE ADDRESSED NO LATER THAN 3/29.

-SILT FENCE THAT WAS PLACED IS TEMPORARY ONLY-HAS NOT BEEN REPLACED AS PROMISED
-PRECAST AND POURED IN PLACE CONCRETE IS HOLDING UP CONNECTION OF DRAINAGEWAY ON WEST SIDE OF PROJECT
-WATTLE IS TO BE PICKED UP-STILL IN PLACE
-SWEEPING WAS TO HAVE BEEN COMPLETED- NOT DONE
03/28/2006 STORMWATER FOLLOW-UP INSP Correction Required -SILT FENCE THAT WAS PLACED IS TEMPORARY ONLY
-PRECAST AND POURED IN PLACE CONCRETE IS HOLDING UP CONNECTION OF DRAINAGEWAY ON WEST SIDE OF PROJECT
-WATTLE IS TO BE PICKED UP
-SWEEPING WAS TO HAVE BEEN COMPLETED (RAIN TODAY-UNABLE TO VERIFY)
03/24/2006 STORMWATER FOLLOW-UP INSP Correction Required PER JOHN ALL WORK ON SWPPP IS TO BE DONE TUESDAY
THERE IS STILL AN ISSUE ON THE NEW DRAINAGE PIPE. I WILL WAIT FOR A DATE ON THE COMPLETE TIE IN AND CLEANING OF THE EXISTING DRAINAGE (VATOR TRUCK WILL BE REQUIRED)
03/23/2006 STORMWATER FOLLOW-UP INSP Correction Required CALLED JOHN WROCKLAGE 240-2787 WITH DAR-HIL TO GET STATUS ON CORRECTIONS THAT NEED TO BE MADE TO THE SITE. HE IS TO CALL ME BACK AND ADVISE WHEN HE HAS DATES AND A PLAN
03/21/2006 STORMWATER FOLLOW-UP INSP Correction Required LAST CORRECTION NOTICE TO BE ISSUED FOR SWEEPING
NOTICE OF VIOLATION AND THEN CITATION TO DAR HIL

3 DAYS TO REPAIR:
SWEEP RESS LP-DIRT FROM UTILITY TIE IN ALONG CURB AND GENERAL TRACK OUT
RE-ESTABLISH SEDIMENT CONTROLS ALONG WEST SIDE OF PROJECT (SILT FENCE OR WATTLE)
REPLACE WATTLE AROUND WATER METER (WEST SIDE OF PROJECT)
REPLACE SEDIMENT CONTROLS AT N END OF NEW DRAINAGE PIPE, REMOVE EXISTING SEDIMENT AND BLOCK S END OF PIPE TO PREVENT SEDIMENT FROM ENTERING EXISTING STORM DRAIN SYSTEM
03/20/2006 STORMWATER FOLLOW-UP INSP Correction Required MET WITH SITE SUPER
PER CONTRACT DAR HIL IS TO SWEEP AND TAKE CARE OF SWPPP.
NO RESPONSE FROM JEREMY OR OTHER REPRESENTATIVE FROM DAR HIL
03/17/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE STILL NOT SWEPT
CALLED JEREMY WITH DAR HIL 349-8002.
HE RETURNED MY CALL AND ADVISED ME HE WILL NOT DO ANY SWEEPING UNLESS THE TRACK OUT/DIRT ON THE STREET IS CAUSED BY DAR HIL. HE SAID DON (SITE SUPER OKLAND) WILL NEED TO TAKE CARE OF THE PROBLEM.
03/16/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE STILL NEEDS TO BE SWEPT
03/13/2006 STORMWATER FOLLOW-UP INSP Correction Required VISITED SITE AGAIN-DAR HIL NOT ON SITE
CALLED JEREMY PM AND LEFT MESSAGE TO CALL ME
REES LOOP NEEDS TO BE SWEPT
03/10/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE STILL NOT SWEPT
ERIC NOT ON SITE (DAR HIL)
CALLED PLUMBING INSPECTOR FOR INFO ON BACKFLOW PREVENTER TESTING
03/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval ROADWAYS STILL NEED TO BE SWEPT
DAR-HIL NOT ON SITE TODAY
WAITING ON SW GAS TO COMPLETE WORK
03/09/2006 STORMWATER FOLLOW-UP INSP Correction Required WATER LINE WAS BEING REMOVED
ROAD STILL NOT SWEPT
03/07/2006 STORMWATER FOLLOW-UP INSP Correction Required TEMP WATER LINE NEEDS TO BE REMOVED FROM ADJACENT PROJECT PROPERTY
SWEEPING NEEDS TO BE DONE IN THE STREET
THIS IS TO BE DONE BY DAR-HIL
02/28/2006 STORMWATER FOLLOW-UP INSP Correction Required STREETS NEED TO BE SWEPT
WATER METER LEAKING INTO REES LOOP
TALKED TO ERIC-SWEEPING WILL TAKE PLACE LATER THIS WEEK
WATTLE TO BE PLACED AROUND THE WATER METER
02/28/2006 STORMWATER FOLLOW-UP INSP Correction Required WATTLE HAS BEEN PLACED
SWEEPING TO STILL BE ADDRESSED
02/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval TALKED WITH ERIC WITH DAR-HIL WILL SWEEP THIS FRIDAY/SATURDAY
DRAINAGE PIPE IS GOING IN AT NW CORNER OF SITE
02/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval WALL FOOTERS POURED.
FOUNDATION BEING POURED
SITE LOOKS GOOD
SWPPP IN GOOD SHAPE
NO CONCERNS AT THIS TIME
02/01/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval WATER LEAK FROM FIRE HYDRANT RAN IN ROAD
SPOKE TO DAR HIL SUPER AND LEAK HAS BEEN REPAIRED
STABILIZED CONSTRUCTION ENTRANCES IN PLACE AND SEEM TO BE WORKING
01/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval NEW ROCK ADDED TO S.C.E.

DUST CONTROLS SEEM TO BE WORKING. SEDIMENT CONTROLS STILL IN PLACE AND WORKING.
01/11/2006 STORMWATER FOLLOW-UP INSP Partial Approval DROPPED OFF INSP REQ/RESULTS FROM 1/10 INSPECTION
01/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval STOPPED AT SITE. SIDEWALK CLOSED SIGNS WERE DOWN AND STABILIZED CONSTRUCTION ENTRANCE NEEDS TO BE REDONE. ADVISED DONALD
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval TRICON ON SITE. SOME BUILDING PAD WORK ON GOING ALSO. SITE IN GOOD SHAPE. REES LOOP IS CLEAR OF TRACKING AND DUST SEEMS TO BE UNDER CONTROL.
01/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval TRICON ON SITE. TIE IN FOR FIRE HYDRANT. TRAFFIC CONTROL ON REES LOOP DUE TO STREET CUT AND TRENCH ON EAST SIDE OF REES LOOP
12/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval DROP OFF FILLED IN AT SW ENTRANCE
ADDL BARRICADES ADDED TO CONSTRUCTION AREA
SWPPP ALL IN GOOD CONDITION
TRICON ON SITE DOING FIRE TIE IN
12/27/2005 STORMWATER FOLLOW-UP INSP Correction Required SPOKE TO JEREMY (DAR-HIL) REGARDING ASPHALT AND CONCRETE REMOVAL ON SW SIDE OF SITE. ADVISED BARRICADING MAY BE IN ORDER DUE TO DROP OFF FROM ASPHALT TO CURRENT GRADE.
CALLED DEE LEE WITH TRANSPORTATION AND ADVISED THIS SITE MAY BE A CONCERN DUE TO WORK IN ROW. 11:23 AM
12/16/2005 STORMWATER FOLLOW-UP INSP Partial Approval - SOME TRACKING STILL, SITE SUPER IS SWEEPING 2X A DAY
- H20 TRUCKS KEEPING DUST DOWN
- DIRT HAULING SHOULD BE CP 12/19
12/15/2005 STORMWATER FOLLOW-UP INSP Partial Approval STOPPED AND SPOKE WITH RICK REGARDING TRACK OUT FROM SITE. WATER PRESSURE IS LOW FROM HYDRANT KLEIN TANK REQUIRES 1.5 HOUR TO FILL. ADDITIONAL METER AT REES LP AND RITA FOR WATER TRUCKS TO FILL IS ADDING TO TRACKING. RICK WILL HIRE SWEEPER TO SWEEP 2X A DAY AND WILL USE A BLADE TO PULL UP ADDITIONAL TRACKING FOR BETTER SWEEPING RESULTS.
12/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval DUE TO DUST SITE IS VERY WET. SWEEPING IS HAPPENING EVERY NIGHT PER SITE SUPER RICK WITH DARHIL