Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2007 | GRADING - FINAL | Approved | ||
| 05/23/2007 | GRADING - FINAL | Denied | 1) COMPLETE/INSTALL BICYCLE PARKING PER GRADING PLAN. 2) INSTALL CONCRETE WHEEL STOPSN NOTE #18 3) COMPLETE SIDEWALK ALONG SOUTH SIDE OF BLDG TO RIGHT-OF-WAY. 4) INSTALL DOWNSPOUTS W/SPLASH BLOCKS AND RIP RAP SPILLWAY PER PLAN ON WEST SIDE OF BLDG. 5) COMPLETE CURB RAMP AND SIDEWALK IN RIGHT-OF-WAY AT SW CORNER OF SITE. 6) INSTALL 6" WATER HARVESTING AREA AT SOUTH SIDE OF BLDG ALONG CURB, SEE NOTE #4. 7) COMPLETE ALL 6" WATER HARVESTING BASINS PER DETAIL #2 ON SHEET C-3. 8) PROVIDE A DRAWING AND/OR STATEMENT FROM THE ENGINEER/ARCHITECT OF RECORD SHOWING CHANGES MADE TO THE WALL OPENINGS ALONG THE EAST WALL. 9) PROVIDE A REVISED DRAWING SHOWING CHANGES MADE TO THE SIDEWALK ALONG THE NORTH SIDE OF THE BLDG. 10) PROVIDE A STATEMENT FROM THE ENG/ARCHITECT STATING THAT COVERED PARKING SHOWN ON THE GRADING PLAN WILL BE ADDRESSED ON A SEPARATE PERMIT. 11) PROVIDE A CERTIFICATION STATEMENT STATING THAT THE RET/DET, WATER HARVESTING AREAS HAVE BEEN CONSTRUCTED PER THE APPROVED PLAN. |