Inspection History Details
Inspection Status: Partial Approval
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2008 | GRADING - FINAL | Partial Approval | Contractor backfill wash cut on west side need to install SWPPP controls and stabilize area. Contractor started wash cut on east side. Still need to install Gabions at end of pipes. | |
| 08/25/2008 | GRADING - FINAL | Partial Approval | Contractor completed digging out around pipe. | |
| 08/22/2008 | GRADING - FINAL | Correction Required | Contractor needs to: 1- Replace SWPPP controls north side. 2- Provide copy of new N.O.I. (2008 Permit) 3- Remove all loose soil material from wash. 4- Clean wash out from around site. 5- Provide wash out area and ensure use. 6- Post N.O.I. at construction entrance. 7- Contractor needs to provide minimun 1' clear space both side of pipe. Spoke to Ruben in regards to. |
|
| 11/15/2007 | GRADING - FINAL | Not ready for Inspection | Contractor install 2 boxes in east hole. Not per detail. | |
| 07/27/2007 | GRADING - FINAL | Partial Approval | Met with Rudy on site, went over wash cut issues. Contractor will needs to: 1- Conduct all work within grading limits. No equipment in wash. 2- Complete first wash cut before starting second. 3- Keep all SWPPP in working order. |
|
| 01/31/2006 | GRADING - FINAL | Not ready for Inspection | Contractor installing silt fencing per SWPPP. Set per-con for 2/1/06 at 1330 with Rudy Ruiz (591-0485). | |
| 01/30/2006 | GRADING - FINAL | Correction Required | Issued Stop Work Oder. BEST grading with no stormwater controls installed. |