Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2011 | STORMWATER FOLLOW-UP INSP | Continued | THE JR TUTTLE CO WORKING ON ROOF NO CHANGE TO SWPPP FROM PAST INSPECTION. | |
| 03/16/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT IS TIME. | |
| 09/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean and stabilize areas next to wash. | |
| 08/25/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address SWPPP issues on site. Spoke to Rudy in regards to. | |
| 06/03/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address construction traffic exiting site from northwest corner. Contractor will need to stabilize area disturbed by construction. | |
| 04/07/2008 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity on site at this time. | |
| 10/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity on site at this time. Contractor continues to work on wash cuts. | |
| 08/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Rudy on 8/2/07, I explained to Rudy it was ok to set both catch boxes and run piping. But wash cut should be completed one at a time. | |
| 07/02/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity. | |
| 06/12/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity, contractor installed chain gate front of project. | |
| 05/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place. Contractor continues to work on perimeter wall. | |
| 05/02/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity at this time. | |
| 04/02/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity at this time. Contractor continues to work on perimeter wall. | |
| 02/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place. No concerns at this time. | |
| 02/07/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity, controls in place. | |
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place. | |
| 12/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Wattle in place, no concerns at this time. | |
| 12/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
| 10/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor installed perimeter wall from entrance to west corner. Contractor started digging footer for building. | |
| 10/05/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Repair silt fence or extend wattle on northwest side of project. | |
| 09/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed wattle along northside. Contractor starting to install block wall of southside. | |
| 08/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Met Mike site super on site (Wed. 8/30) went over correction that need to be made to SWPPP controls. I Explained to Mike if temp controls are not installed by the next inspection I will issue a Notice of Violation for allowing a discharge into the wash. 40' of perimeter wall fell down. Basin holding water for more then 24 hours. (5 days) |
|
| 08/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Met Mike on site went over SWPPP issues. I explained to Mike temp controls have to install in erosion area next to Santa Cruz. | |
| 08/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor has not addressed items from last inspection 8/2/06. Spoke to Rudy at approx. 1500 hours and went over items that need to be addressed. I told Rudy if the items are not addressed I would issue a NOV. Rudy asked me to call Michelle Guy in regards to repairs in wash area. | |
| 08/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair/replace stormwater controls. Repair erosion on wash bank. Contacted Rudy site super via cell 591-0485. | |
| 07/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair/replace stormwater controls northeast corner. Contacted Rudy via cell phone in regards to issues. | |
| 06/20/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to repair hole in fence northeast corner. | |
| 06/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor cleaned wash out from last inspection. | |
| 05/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up concrete and mason wash out around site. Contractor needs to provide proper wash out area for subs. Spoke to Rudy Ruiz in regards to issue. | |
| 05/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Need to keep eye on northeast corner of project. | |
| 04/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor starting perimeter wall on west side. | |
| 04/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor completed entrance off of Irvington. No stormwater concerns at this time. | |
| 03/20/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | OK to remove some silt fencing on eastside. 90 feet on northeast corner to remain running south. | |
| 03/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed wattle on south side of project. | |
| 02/28/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Gilbert on site and discussed additional waddle to be installed from the construction entrance to the southwest corner. Gilbert said he would have it installed soon. | |
| 02/23/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installing construction entrance off Irvington Rd. Set up meeting with Gilbert for Tuesday 2/28/06 at 1100 hours, in regards to additional stormwater controls on southwest side. | |
| 02/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Talked to Gilbert in regards to contractor using property next to project for access. I explaioned to Gilbert he will need to get a construction easement for the property. Gilbert told me he thought they had an easement and would fax me the paper work. I received on 2/7/06. Also conctractor needs to remove dirt ramp from roadway. | |
| 01/24/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. | |
| 01/10/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity at this time. | |
| 12/19/2005 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity at this time. | |
| 12/05/2005 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity at site. |