Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/01/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | Completed pre-con. Contractor will need to: 1. Produce copy of Pima Co. floodplain use permit. 2. Provide schedule for working in wash area. 3. Contractor wil not be able to start wash work until all materials are on site. |