Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU02499
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2008 | GRADING - FINAL | Approved | Per EE no permit conditions. | |
07/09/2008 | GRADING - FINAL | Partial Approval | Complete punch list dated 6/18/08. | |
06/25/2008 | GRADING - FINAL | Partial Approval | Met on site with Site Engineer and Chris site super. In regards to safety barrier in basin. Contractor will need to provide as-built for basin show elevations. Provide letters for site cert. per COT drainage manaul and Development Standard Grading 11-01. | |
06/24/2008 | GRADING - FINAL | Partial Approval | Met on site with Chris site super. Went over truncated domes placement at traffic table and scupper installation. | |
06/18/2008 | GRADING - FINAL | Partial Approval | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Provide engineer cert. Per C.O.T. drainage manaul ch. XIV, sec. 14.2 (7). 3- Provide statement of conformance from engineer. Per DS 11-01.16.1.D. 4- Provide asbuilts of west detention/retention basin. Showing limits of hign water (24"). 5- Complete all scupper work. Provide positive flow for all scuppers. 6- Install curbs cuts south side of building #2 and #20. 7- Complete all sidewalk work. 8- Clean all wash out from site. 9- Clean all construction debris from site. 10- Remove trash dumpster from site. 11- Remove port-a-potty from site. 12- Address ponding in street northwest corner of building #9. 13- Complete all Striping. 14- Scupper all down spouts under sidewalks. 15- Install truncated dome at traffic table. 16- Install all bike parking. 17- Provide drainage on east side per approved drawings. 18- Install pilot holes for trash enclosures. (open and closed) Spoke to Chris site super in regards to. |
|
12/10/2007 | GRADING - FINAL | Partial Approval | Contractor installed bleeder pipe on south side between basins. Contractor needs to provide eleavations for inlet and discharge. | |
10/03/2007 | GRADING - FINAL | Not ready for Inspection | Met with Chris site super, Contractor wants to start excavating west side of project. There are no approved drawing for this area. Chris want to use the soil materail for his building pads, but is not sure there will be enough. I explained that no work should take place until there is an approved drawing on site and any work that does happen will be at risk for the general contractor. |