Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU02499
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2008 | STORMWATER FOLLOW-UP INSP | Approved | Al areas stabilized. | |
03/13/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed correction notice. Contractor still needs to provide new washout areas for sub's. address side slope on southwest side of project. | |
03/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor has 4 days to address: 1- Clean up all wash out around site. 2- Sweep 34th. St. 3- Put all SWPPP controls back in working order. 4- Install construction entrance at all egrees locations. 5- Replace all damaged signage. (35th) 6- Clean up trash. 7- Contractor will need to stabilize all areas disturbed by construction. Before end of project. If items are not addressed I will issue stop work order/notice of violation. Spoke to Chris site super in regards to all items. |
|
12/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean 34th. and 35th. streets. 2- Repair wattle around site. 3- Limit construction access. Install construction entrance as needed per approved SWPPP. 4- Limit vehicle access in basins. Spoke to site super in regards to. |
|
11/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make minor repairs to SWPPP controls. Will met Chris site super on site to look at Basins. |