Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU02254

Parcel: 130010050


Addresses:

2965 E FAIRLAND SV


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T05BU02254

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
12/12/2006 GRADING - FINAL Approved Contractor completed punch list. See punch list T05CM04691
12/11/2006 GRADING - FINAL Partial Approval Met with richard on site looked at vert. slope around basin. Richard said it would be completed by 12/12/06.
11/30/2006 GRADING - FINAL Not Applicable Dropped off another copy of punch for Richard site super. Left with Luiz, per Richard.
11/28/2006 GRADING - FINAL Not Applicable Met on site with Richard went over punch list items. Walked site.
11/13/2006 GRADING - FINAL Not Applicable Met on site with Elizabeth to discuss basin erosion, slope bank protection and the use of wheel stops for curb.
11/08/2006 GRADING - FINAL Denied Met on site with super and engineer, went over punch list and what will be needed for temp C of O.
10/31/2006 GRADING - FINAL Denied See punch list on permit T05CM04691.
10/09/2006 GRADING - FINAL Partial Approval Spoke to Richard site super, in regards to the south side of project along basin. The Slope is a vert. that is not stabilized. I told Richard engineer needs to address this.
08/16/2006 GRADING - FINAL Partial Approval Met with Richard site super on site. Went over scupper locations. Bollards for trash enclosure per DS 6-01. Headers for HC ramps needed to stop water from running across.
06/26/2006 GRADING - FINAL Correction Required Met Steve with Earthworks and went over protection for inlet and outlet for detention basins. Also talked to Richard site super in regards to bollards for side walls in trash enclosure, Safety barrier around north detention basin and down spouts from roof dumping on to sidewalk. Down spouts need to be scuppered under sidewalk.