Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU02254
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/12/2006 | GRADING - FINAL | Approved | Contractor completed punch list. See punch list T05CM04691 | |
12/11/2006 | GRADING - FINAL | Partial Approval | Met with richard on site looked at vert. slope around basin. Richard said it would be completed by 12/12/06. | |
11/30/2006 | GRADING - FINAL | Not Applicable | Dropped off another copy of punch for Richard site super. Left with Luiz, per Richard. | |
11/28/2006 | GRADING - FINAL | Not Applicable | Met on site with Richard went over punch list items. Walked site. | |
11/13/2006 | GRADING - FINAL | Not Applicable | Met on site with Elizabeth to discuss basin erosion, slope bank protection and the use of wheel stops for curb. | |
11/08/2006 | GRADING - FINAL | Denied | Met on site with super and engineer, went over punch list and what will be needed for temp C of O. | |
10/31/2006 | GRADING - FINAL | Denied | See punch list on permit T05CM04691. | |
10/09/2006 | GRADING - FINAL | Partial Approval | Spoke to Richard site super, in regards to the south side of project along basin. The Slope is a vert. that is not stabilized. I told Richard engineer needs to address this. | |
08/16/2006 | GRADING - FINAL | Partial Approval | Met with Richard site super on site. Went over scupper locations. Bollards for trash enclosure per DS 6-01. Headers for HC ramps needed to stop water from running across. | |
06/26/2006 | GRADING - FINAL | Correction Required | Met Steve with Earthworks and went over protection for inlet and outlet for detention basins. Also talked to Richard site super in regards to bollards for side walls in trash enclosure, Safety barrier around north detention basin and down spouts from roof dumping on to sidewalk. Down spouts need to be scuppered under sidewalk. |