Permit: T05BU02233

Parcel: 107060560

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
09/13/2006 STORMWATER INSTALL OF CONTROLS Approved SEDIEMNT CONTROLS HAVE BEEN INSTALLED PER AGREEMENT MADE BETWEEN INSPECTOR AND CONTRACTOR/AND THE SWPPP.
1) ENSURE A CONCRETE WASH OUT IS ESTABLISHED AND USED ON SITE.
2) ESURE SEDIMENT CONTROLS ARE MAINTAINED ON A ROUTINE BASIS.
08/30/2006 STORMWATER INSTALL OF CONTROLS Correction Required 1) CONTRACTOR WILL INSTALL SILT FENCE ALONG BACK HALF OF WEST PERIMETER AND ALONG THE SOUTH BOUNDRY.
2) INSTALL WADDLE ALONG ENTRANCE TO SITE.
3) PROVIDE A DESIGNATED CONCRETE WASH OUT PER PLAN
4) ENSURE AN APPROVED STORM WATER PLAN IS MADE AVAILABLE ON SITE.