Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2007 | STORMWATER FOLLOW-UP INSP | Approved | Contractor stabilized all areas. | |
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed concrete access ramp, also cleaned silt out of basin. Contractor needs to complete perk test and finsh punch list. | |
| 07/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to stabilize access ramp. Todays storm washed it out. Contractor still needs to address items 3, 4, 5, and 11. | |
| 06/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make repairs to access ramp and clean silt out of basin. Contractor continues to work on punch list. | |
| 05/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor paved parking lot. | |
| 05/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Address: 1- Reinstall wattle around perimeter. 2- provide proper wash out for subs. 3- Clean up concrete wash out and mason wash out. 4- Clean Medina Rd. Detention basin holds more then 2' of water and has 1 to 1 slopes, Safety barrier will be required. Spoke to Mark site super in regards to all issues. |
|
| 05/01/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to control track out on both north and south sides of project. | |
| 04/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. |