Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2007 | GRADING - FINAL | Approved | Contractor completed punch list. | |
| 01/26/2007 | GRADING - FINAL | Not ready for Inspection | Contractor needs to: 1- Complete all rip rap, front and rear of building. (slopes 1 to 1, 1.5 to1) 2- Remove sand from site. 3- Remove trash dumpster from site and port-a-potty. 4- Stabilize all areas disturbed by construction. |