Date Description Inspector Results Comments
03/18/2009 STORMWATER FOLLOW-UP INSP Approved
05/07/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME
02/28/2008 STORMWATER FOLLOW-UP INSP Partial Approval VERTICAL WORK CONTINUING
NO STORMWATER CONCERNS
11/30/2007 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT ON ASPHALT THROUGHOUT SITE
ERIC TO PROTECT STOCKPILE WITH WATTLE
11/28/2007 STORMWATER FOLLOW-UP INSP Correction Required CALLED LOU BOCK REGARDING STOCK PILE ON SITE
WAITING FOR CALL BACK FROM BOYD CONSTRUCTION FOR REMOVAL DATE
10/29/2007 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK CONTINUING
DRAINAGEWAY WORK IN CENTER OF COMPLEX BEING DONE
SITE IS MOSTLY STABLE
09/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval SMALL AMOUNT OF TRACK OUT AT THIS SITE AND HOUGHTON VALENCIA COMMERCIAL CENTER
NO OTHER CONCERNS AT THIS TIME
08/14/2007 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK CONTINUES NO CONCERNS
07/24/2007 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT ONTO HOUGHTON
CALLED AND TALKED TO LOU BOCK SWEEPER TO BE ONSITE
NEW ROCK TO BE DELIVERED PER BRIAN 7/26
05/22/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
OFF SITE WORK CONTINUING
CONCRETE WASHOUT ON SITE FOR SHELL BUILDINGS
SITE IS STILL GRADED TO DRAIN TO BASIN
01/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
UTILITY INSTALLATION CONTINUES
12/28/2006 STORMWATER FOLLOW-UP INSP Prior to 1010/1015 BASIN APPEARS TO BE WORKING
NO CONCERNS AT THIS TIME
11/08/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS
BASINS ROUGH GRADED AND SITE DRAINS TO THEM
10/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK CONTINUING
09/08/2006 STORMWATER FOLLOW-UP INSP Continued SWEEP TRACK OUT ON MEADOW TRL AND IN ACE DRIVEWAY/PARKING LOT

CALLED LOU BOCK. HE ADVISED DIGGUM WILL SWEEP
08/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval UTILITY WORK STILL GOING ON

NO TRACK OUT CONCERNS
BASIN ROUGH GRADED AND APPEARS TO BE WORKING
08/08/2006 STORMWATER FOLLOW-UP INSP Partial Approval UTILITY WORK ONGOING
NO OFF SITE TRACKING/CONCERNS
08/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
UNDERGROUND UTILITIES BEING INSTALLED
07/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO SITE WORK- ROAD IMPROVEMENTS ONGOING
07/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
SITE IS NOT BEING WORKED TODAY
06/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
BAR DITCH APPEARS TO HOLDING WATER AND SEDIMENT IN PLACE OF BASIN
LITTLE OR NO TRACK OUT
06/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
06/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval ONGOING DIRT WORK
05/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval PER ERIC BASIN SHOULD BE ROUGH GRADED BY 5/22
05/08/2006 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE TO ERIC
V-DITCH SHOULD BE INSTALLED 5/9
05/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval TALKED TO ERIC ON SITE
V DITCH TO BE CUT ON EAST SIDE OF PROJECT UNTIL BASIN IS ROUGHED IN