Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2011 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/23/2010 | STORMWATER FOLLOW-UP INSP | Continued | AWAITING COMPLETION, SITE MOSTLY BUILT OUT. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/18/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 01/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. C OF O FOR ENG APPROVAL OF BLDG #6 - APPROVED PLANS SHOW NO DETAILS ON STORM DRAIN LINES THAT LEAD FROM ROOF DRAINS TO RET/DET BASINS (WHAT MATERIALS, SIZE, GRADES ECT..). | |
| 09/29/2009 | STORMWATER FOLLOW-UP INSP | Approved | RET/DET BASINS HAVE BEEN INSTALLED. ALL OTHER DRAINAGE REQUIREMENTS HAVE BEEN COMPLETED. SOME BLDG CONSTRUCTION REMAINS. | |
| 08/05/2009 | STORMWATER FOLLOW-UP INSP | Continued | MET W/ SUPERINTENDENT (TODD IMAN 349-4595), REVIEWED GRADING PLAN. SITE WORK IS ABOUT 75% COMPLETED, CONSTRUCTION IS DUE TO BE COMPLETED BY DEC 09. NO STORM WATER CONCERNS. WILL RESEARCH SITE/GRADING PLANS AND PREPARE FOR FINAL INSPECTION |
|
| 04/08/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 01/29/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS SWPPP PLAN WILL BE MODIFIED TO SHOW VEGETATIVE BUFFER SOUTH OF BARNS AND WILL BE MONITORED FOR EFFECTIVENESS. |
|
| 01/21/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS OK TO REMOVE SOUTH PERIMETER SILT FENCE ADJACENT TO (2) BARNS. VEGETATIVE BUFFER STRIP SHOULD PROVIDE ADEQUATE STORMWATER, OPERATOR WILL MONITOR FOR SWPPP COMPLIANCE. |
|
| 11/04/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 07/30/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS, R/D BASINS HOLDING WATER, MOSQUITO DUNKS ARE BEING USED, BASINS WILL BE DE-WATERED | |
| 04/23/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 10/23/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 07/12/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NEW GRAVEL ADDED. | |
| 07/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE ADDITIONAL GRAVEL ON STABILIZED CONSTRUCTION ENTRANCE. | |
| 04/24/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 03/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL CORRECTIONS HAVE BEEN COMPLETED. NO STORMWATER CONCERNS |
|
| 03/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPAIR SILT FENCE NEAR SW CORNER. 2. REPLACE MISSING STRAWBALES IN CHANNEL AT SOUTHEAST CORNER OF SITE. 3. PROVIDE ADDITIONAL GRAVEL ON ENTRANCE. |
|
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 09/28/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | R/D BASINS HAVE BEEN DE-WATERED NO STORMWATER CONCERNS. |
|
| 09/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | R/D BASINS HAVE STANDING WATER FOR MORE THAN 24 HOURS AFTER RAINFALL EVENT. CONTRACTOR HAS BEEN APPLYING MOSQUITO LARVICIDE TO STANDING WATER. RECOMENDATION: DRAIN BASINS, REMOVE SEDIMENT, AND CONTACT THE ENGINEER TO ADDRESS PONDING WATER. NO OTHER STORMWATER CONCERNS. |
|
| 09/12/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CONTACT, NO ONE ON SITE. | |
| 08/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN GOOD CONDITION, SWPPP CONTROLS WORKED WELL FOR RECENT HEAVY RAINFALL. | |
| 05/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 01/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 12/29/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWPPP CONTROLS ARE IN GOOD CONDITION. SWEEP TRACKED SOIL FROM THE PUBLIC RIGHT OF WAY. |
|
| 12/01/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS |