Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2008 | GRADING - FINAL | Approved | All items on final punch list complete, project finaled. | |
| 12/15/2006 | GRADING - FINAL | Cancelled | Cancelled per site super. Via cell phone call (12-14-06). | |
| 12/14/2006 | GRADING - FINAL | Denied | Contractor still needs to address items 3 and 4. | |
| 09/07/2006 | GRADING - FINAL | Denied | Contractor needs to: 1- Submit copy of el. cert. Per note #6 on approved drawings. 2- Rip Rap area to the east of guest house. 3- Submit asbuilt drawing showing drainage channel on south side of house and revised grading limits. 4- Repair sidewalk damaged by construction. |
|
| 12/08/2005 | GRADING - FINAL | Not ready for Inspection | Contractor digging footers. No concerns at this time. |