Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2006 | GRADING - FINAL | Approved | Contractor completed punch list. | |
| 04/05/2006 | GRADING - FINAL | Denied | Complete updated punch list. 1- Finish stabilizing disturbed areas. 2- Install H.C. ramp per City of Tucson standards. 3- Install trucated domes on H.C. ramp. 4- Install correct signage. 5- Provide new approved drawing for grading. 6- Provide letter in regards to drainage ways from engineer. 7- Install trash enclosure per City of Tucson standards. |
|
| 04/03/2006 | GRADING - FINAL | Denied | Contractor needs to address: 1- Stabilize all areas disturbed by construction. 2- Have all changes to drawings approved. 3- Provide letter from engineer in regards to drainage ways. 4- Clean up all construction debris. 5- Provide inlet/outlet for basins. 6- Install H.C. ramp per C of T standards. 7- Install trucated domes on H.C. ramp. 8- Install proper signage. 9- Rip rap all slopes steeper then 3 to 1. 10- Install safety barrier around basin north west corner of project. |