Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01913
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/01/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONSTRUCTION FENCING IS DOWN SITE NEEDS TO BE SWEPT MAINTENANCE STILL NEEDS TO BE DONE ON SEDIMENT CONTROLS |
|
05/18/2006 | STORMWATER FOLLOW-UP INSP | Approved | SITE IS ALMOST COMPLETE SEDIMENT CONTROLS HAVE BEEN PLACED IN FRONT OF STORMDRAIN INLETS-COULD USE SOME MAINTENANCE SURROUNDING AREAS OF THE SITE NEED TO BE SWEPT |
|
04/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP STREET ON WEST SIDE OF PROJECT (ON GOING) PLACE SEDIMENT CONTROLS ACROSS SCUPPER INLETS TO PREVENT TRACK OUT FROM ENTERING STORMDRAIN (EAST AND WEST SIDE OF STREET) EAST SIDE DONE-WEST NOT REPLACE ANY DAMAGED WATTLE RE-ESTABLISH ALL CONSTRUCTION ENTRANCES W/ ROCK (NE IS DONE WEST SIDE WILL NO LONGER BE AN ENTRANCE AS OF TOMORROW) CONCRETE WASH OUT NEEDS TO BE SIGNED AND MAINTAINED(STILL NOT DONE) PORTA TOILET ON EAST SIDE OF SITE TIPPED OVER HAS BEEN RESET |
|
03/30/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | LEFT STORMWATER PACKET HIGHLIGHTING BMP FOR CONCRETE WASH OUT AND MEMO ON MAINTAINING SITE COMPLIANCE. | |
03/29/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP STREET ON WEST SIDE OF PROJECT PLACE SEDIMENT CONTROLS ACROSS SCUPPER INLETS TO PREVENT TRACK OUT FROM ENTERING STORMDRAIN (EAST AND WEST SIDE OF STREET) REPLACE ANY DAMAGED WATTLE RE-ESTABLISH ALL CONSTRUCTION ENTRANCES W/ ROCK CONCRETE WSH OUT NEEDS TO BE SIGNED AND MAINTAINED PORTA TOILET ON EAST SIDE OF SITE TIPPED OVER-PER GARY SAGUARO HAD BEEN CALLED |
|
03/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 2ND NOTICE SWEEP TRACK OUT-ESTABLISH REGULAR SWEEPING SCHEDULE RE-ESTABLISH STABILIZED CONST ENTRANCE PROTECT ALL STORMDRAINS PER SWPPP |
|
03/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP TRACK OUT-ESTABLISH REGULAR SWEEPING SCHEDULE RE-ESTABLISH STABILIZED CONST ENTRANCE PROTECT ALL STORMDRAINS PER SWPPP |