Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01795
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2006 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 04/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF SILVERBELL ROAD AS NEEDED. 2) MAINTAIN SEDIMENT CONTROLS PLACED IN FRONT OF THE CATCH BASIN IN FRONT OF SITE. 3) ADD SEDIMENT CONTROLS AROUND CATCH BASIN LOCATED ON EAST SIDE OF SITE. |
|
| 04/07/2006 | STORMWATER FOLLOW-UP INSP | Violation | NOV ISSUED 4/6/06 - IN NON COMPLIANCE WITH STORM WATER ORDINANCE, SEC 26-40, PARAGRAPH #3 1) SWEEP UP ALL TRACKED MATERIAL OFF OF SILVERBELL RD 2) PROTECT CATCH BASIN IN FLOW LINE ADJACENT TO SITE. WILL RE-INSPECT ON TUE 4/11/06, STOP WORK MAY BE ISSUED IF REFUSAL TO COMPLY. |
|
| 04/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP ALL TRACKED MATERIAL OFF OF SILVERBELL RD. 2) ESTABLISH A STABILIZED CONSTR. ENTRANCE/EXIT AT POINT WHERE TRACKING OCCURS. 3) PLACE SANDBAGS IN FRONT OF CATCH BASIN ON CURB IN FRONT OF SITE. COMPLETE THE ABOVE ITEMS : TWO WORKING DAYS OR A NOTICE OF VIOLATION WILL BE ISSUED. |
|
| 12/01/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER CONCERNS AT THIS TIME |