Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU01795

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU01795

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/30/2006 STORMWATER FOLLOW-UP INSP Approved
04/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval 1) CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF SILVERBELL ROAD AS NEEDED.
2) MAINTAIN SEDIMENT CONTROLS PLACED IN FRONT OF THE CATCH BASIN IN FRONT OF SITE.
3) ADD SEDIMENT CONTROLS AROUND CATCH BASIN LOCATED ON EAST SIDE OF SITE.
04/07/2006 STORMWATER FOLLOW-UP INSP Violation NOV ISSUED 4/6/06 - IN NON COMPLIANCE WITH STORM WATER ORDINANCE, SEC 26-40, PARAGRAPH #3

1) SWEEP UP ALL TRACKED MATERIAL OFF OF SILVERBELL RD
2) PROTECT CATCH BASIN IN FLOW LINE ADJACENT TO SITE.

WILL RE-INSPECT ON TUE 4/11/06, STOP WORK MAY BE ISSUED IF REFUSAL TO COMPLY.
04/05/2006 STORMWATER FOLLOW-UP INSP Correction Required 1) SWEEP UP ALL TRACKED MATERIAL OFF OF SILVERBELL RD.
2) ESTABLISH A STABILIZED CONSTR. ENTRANCE/EXIT AT POINT WHERE TRACKING OCCURS.
3) PLACE SANDBAGS IN FRONT OF CATCH BASIN ON CURB IN FRONT OF SITE.

COMPLETE THE ABOVE ITEMS : TWO WORKING DAYS OR A NOTICE OF VIOLATION WILL BE ISSUED.
12/01/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORM WATER CONCERNS AT THIS TIME