Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01786
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/23/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO DENNIS ON SITE TAPER TO NOT WASH OUT ANYWHERE OTHER THAN THE DESGINATED WASHOUT AREA DENNIS TO CALL BEFORE POURING RAMPS |
|
| 03/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 02/21/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 01/19/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 12/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SMALL AMOUNT OF TRACK OUT NO OTHER CONCERNS AT THIS TIME |
|
| 10/31/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 10/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | ONTROLS ALL IN PLACE WASOUT SIGNED BOLLARDS INSTALLED IN TRASH ENCLOSURE |
|
| 09/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH DENNIS ON SITE CONCRETE WASH OUT TO BE MOVED TO A NEW LOCATION- PIT ALREADY DUG MASONS CONCRETE WASH OUT TO BE CLEANED UP AND CONTAINED. |
|
| 08/21/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CAYLOR CONST ONSITE CORRECTION NOTICE ISSUED 10 DAYS -SWPPP POSTING NEEDS TO BE WITH OTHER PERMITS -PLACE CONCRETE WASHOUT ON SITE WITH A SIGN |