Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | SULAND WILL BE DOING DIRT WORK MET WITH CHUCK AND DENNIS 237-8643 |
|
| 03/06/2006 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO SITE WORK. TRAILER HAS BEEN SET AND IS BEING USED FOR BANKING BUSINESS |
|
| 01/09/2006 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SPOKE WITH PROJECT ENGINEER, MEGAN MAGEE. THE CONSTRUCTION ENTRANCES AT THE WESTERN EDGE OF THE SITE NEED TO BE STABALIZED. THE STORMDRAIN ON THE EASTERN BORDER OF THE SITE BETWEEN THE CONSTRUCTION ENTRANCES NEEDS TO BE PROTECTED. PROVIDED TRIUMPH WITH PRE-CON INFORMATION. |