Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2006 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized | |
| 10/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor starting to cut basin in. Spoke to Jim in regards to Providing phased drawing for temp C of O, stabilizing all areas disturbed by construction and submitting revised drawings for approval. | |
| 10/03/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Jim F. on site to look at grading. Checked grade around rear of building. | |
| 10/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor removed fence, also started grading parking lot. | |
| 08/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor starting to grade parking area. | |
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor install gravel pad to controls track out. | |
| 07/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to control track out. | |
| 07/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to contractor about installing safety barrier around open hole. (in rightway) | |
| 06/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor made correction noted on last inspection. | |
| 05/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Put wattle back in working order. Contractor buired in various locations. | |
| 05/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- uncover wattle northside of project. 2- Clean dirt out of roadway, or install stormwater controls around. Spoke to owners son in regards to issues. |
|
| 05/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- install construction entrance if contractor continues to use entrance off Ganley. 2- Repair stormwater controls northeast corner of project. Spoke to owners son in regards to issues. |
|
| 04/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to watch track out. | |
| 03/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
| 03/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contacted owner jim in regards to black oily liquid dumped in hole on north side of project. I explained to Jim it needed to be cleaned up ASAP. Also he needs to schdule me back out when clean up starts. | |
| 02/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. Building pad complete. | |
| 01/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Met on site with owner of site. The owner is also acting as the super for this project. This is his first attempt at construction. I went over SWPPP issues with him and also went over the SWPPP drawings. I explained SWPPP controls are are the first step. I told him if did not get them up in 14 days I would issue a correction notice which could result in a stop work order or a citation for violation of the stormwater ordinance. |