Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01651
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/05/2020 | STORMWATER FOLLOW-UP INSP | Approved | SITE COMPLETED BY GREGG SASSY SOUTHERN ARIZONA LAND TRUST | |
01/26/2015 | STORMWATER FOLLOW-UP INSP | Continued | CONTROLS INSTALLED . | |
01/16/2015 | STORMWATER FOLLOW-UP INSP | Continued | MET WITH GC ABOUT CLEANING SITE AND REPAIRING CONTROLS. | |
01/23/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
12/20/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
12/13/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY ON SITE AT THIS TIME. | |
10/24/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY OR CHANGES FROM LAST INSPECTION. | |
10/07/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
10/06/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
09/22/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
08/04/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
07/28/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY. | |
07/27/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
07/25/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACIVITY. | |
07/19/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY AT THIS TIME. | |
07/13/2011 | STORMWATER FOLLOW-UP INSP | Continued | SOME NEW SWPPP CONTOLSS HAVE BEEN INSALLED BUT NO ACTIVITY TODAY. | |
07/11/2011 | STORMWATER FOLLOW-UP INSP | Continued | TALK WITH TERRY ON SITE INSTALLING SWPPP CONTROLS AND RIP RAP. | |
07/07/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGE FROM LAST INSPECTION. | |
07/01/2011 | STORMWATER FOLLOW-UP INSP | Continued | CALLED WALTER ABOUT COMPLETING SWPP CONTROLS. | |
06/30/2011 | STORMWATER FOLLOW-UP INSP | Continued | CALL CONTRACTOR TO CHECK ON SWPPP. | |
05/20/2011 | STORMWATER FOLLOW-UP INSP | Continued | WORKING ON SWPPP CONTROLS. | |
05/13/2011 | STORMWATER FOLLOW-UP INSP | Continued | TALK WITH WALTER ON THE PHONE . MEETING ON MONDAY TO GO OVER SWPPP PLAN. THEY HAVE STARTED ON STOCK PILE. | |
05/11/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO SITE WORK BEING DONE. | |
05/10/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO ACTIVITY ON SITE.NO WASHOUT OR CHANGE FROM LAST INSPECTION. THAT I CAN SEE. | |
04/04/2011 | STORMWATER FOLLOW-UP INSP | Continued | DAVES CALLING CONTRATOR ABOUT SWPPP REPAIRS. | |
05/22/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor installed controls. Still need to address stabilizing all areas disturbed. Spoke to Josh in regards to. | |
05/20/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair silt fence that is ripped and not in work condition. Also need to repair controls on southeast side of basin. Spoke to Josh in regards to. | |
05/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Met with Josh on site to look at SWPPP controls. Walked site and looked at problems with SWPPP controls. Josh said he will have things repaired by Wednesday 5-21-08. | |
05/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SWPPP controls are still not repaired. Spoke to Jim 409-6703 explained if controls are not installed per approved SWPPP I will proceed with Citation. Jim said he get someone on it. | |
05/08/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Survey equipment on site. SWPPP controls have not been repaired or replaced. | |
11/26/2007 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | Contractor installed AB in roadway and formed up curb and sidewalk northside of project. | |
10/25/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install SWPPP controls a long northside of project. | |
10/04/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met super on site. Contractor address items from NOV dated 9/18/07. Contractor needs to keep all SWPPP controls in working order. | |
09/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued NOV, Contractor has 7 days to, get site in compliance with approved SWPPP and AZPDES/NPDES regulations. Gave NOV to site super Justin Chastain. | |
09/17/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Controls not in working order. Contractor needs to repairs to SWPPP controls, tracking mud into street. Spoke to Justin site super, set up meeting onsite for 9/18/07 at 1000 hours. | |
08/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Stabilize area along Corona St. 2- Repair/replace SWPPP controls. 3- Install construction entrance. |
|
08/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address SWPPP around site. Silt fence down, needs to be repair/replaced. Also needs to reinstall safety barrier. | |
07/02/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Re-install construction entrance. 2- Clean track out from site. 3- Stake down wattle per approved drawing. Spoke to Josh in regards to issues, via cell phone. |
|
06/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor install security fence front of property. Contractor needs to re-install construction entrance. | |
05/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Received complaint call from home owner. Contractor needs to: 1- Re-install SWPPP controls around perimeter of site. 2- Contractor needs to keep SWPPP and Grading drawings on site durning construction. 3- Contractor needs to install safety barrier a long sewer trench. 4- Contractor needs to keep site wet to stop dust blowing off site. Spoke to Josh (409-6705) site super in regards to all issues. If contractor continues to work without addressing items, I will issue a Stop Work Oder. |
|
05/15/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to replace or repair silt fence west side of project. Contractor started installing sewer line. Spoke to Josh site super in regards to. | |
05/04/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to replace or repair silt fence west side of project. Contractor started dumping sand on site. | |
02/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor made repairs from last inspection. More material dumped on site. | |
02/07/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair silt fence. Spoke to Josh in regards to silt fence and stabilizing project it has been approx 4 months since last activity. | |
01/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make repairs to silt fencing on west side of project. | |
12/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install controls around walking path. | |
11/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity at this time. | |
10/23/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Repair silt fence on west side of project. 2- Pick up trash north side of project. (blue water tape) Contacted Josh in regards to. |
|
10/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to repair silt fence on southwest corner of project. Spoke to Josh in regards to. | |
09/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Site unchanged. | |
08/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
08/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor address issues from last inspection. Contractor needs to address port-a-potty. | |
08/01/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair/replace silt fence southwest corner of property. Also basin holding water. Keep streets clean. Called Josh via cell phone left message. Josh called back and I went over issues with him. |
|
07/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair/replace stormwater controls. Spoke to Josh via cell phone in regards to. | |
06/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. Contractor moving AB on site. Contractor completed 5 building pads. | |
06/05/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed wattle on northwest corner. | |
05/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor made repairs to silt fence. | |
05/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair stormwater controls on northwest and southwest corners of project. Spoke to Josh at approx. 1040 hours. in regards to issue. | |
04/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Josh (409-6705) in regards to repairing controls on northwest side of project. | |
04/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair or replace stormwater controls on north side of project. | |
03/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install silt fence per SWPPP detail. Also looks as if contractor continues to wash street down with water truck. Josh is out of town and talked to Jim (409-6703) in regards to issues. |