Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU01651


Addresses:

225 W CORONA RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU01651

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
05/05/2020 STORMWATER FOLLOW-UP INSP Approved SITE COMPLETED BY GREGG SASSY SOUTHERN ARIZONA LAND TRUST
01/26/2015 STORMWATER FOLLOW-UP INSP Continued CONTROLS INSTALLED .
01/16/2015 STORMWATER FOLLOW-UP INSP Continued MET WITH GC ABOUT CLEANING SITE AND REPAIRING CONTROLS.
01/23/2012 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
12/20/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
12/13/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY ON SITE AT THIS TIME.
10/24/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY OR CHANGES FROM LAST INSPECTION.
10/07/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
10/06/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
09/22/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
08/04/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
07/28/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY.
07/27/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
07/25/2011 STORMWATER FOLLOW-UP INSP Continued NO ACIVITY.
07/19/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY AT THIS TIME.
07/13/2011 STORMWATER FOLLOW-UP INSP Continued SOME NEW SWPPP CONTOLSS HAVE BEEN INSALLED BUT NO ACTIVITY TODAY.
07/11/2011 STORMWATER FOLLOW-UP INSP Continued TALK WITH TERRY ON SITE INSTALLING SWPPP CONTROLS AND RIP RAP.
07/07/2011 STORMWATER FOLLOW-UP INSP Continued NO CHANGE FROM LAST INSPECTION.
07/01/2011 STORMWATER FOLLOW-UP INSP Continued CALLED WALTER ABOUT COMPLETING SWPP CONTROLS.
06/30/2011 STORMWATER FOLLOW-UP INSP Continued CALL CONTRACTOR TO CHECK ON SWPPP.
05/20/2011 STORMWATER FOLLOW-UP INSP Continued WORKING ON SWPPP CONTROLS.
05/13/2011 STORMWATER FOLLOW-UP INSP Continued TALK WITH WALTER ON THE PHONE . MEETING ON MONDAY TO GO OVER SWPPP PLAN. THEY HAVE STARTED ON STOCK PILE.
05/11/2011 STORMWATER FOLLOW-UP INSP Continued NO SITE WORK BEING DONE.
05/10/2011 STORMWATER FOLLOW-UP INSP Continued NO ACTIVITY ON SITE.NO WASHOUT OR CHANGE FROM LAST INSPECTION. THAT I CAN SEE.
04/04/2011 STORMWATER FOLLOW-UP INSP Continued DAVES CALLING CONTRATOR ABOUT SWPPP REPAIRS.
05/22/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor installed controls. Still need to address stabilizing all areas disturbed. Spoke to Josh in regards to.
05/20/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair silt fence that is ripped and not in work condition. Also need to repair controls on southeast side of basin. Spoke to Josh in regards to.
05/14/2008 STORMWATER FOLLOW-UP INSP Correction Required Met with Josh on site to look at SWPPP controls. Walked site and looked at problems with SWPPP controls. Josh said he will have things repaired by Wednesday 5-21-08.
05/13/2008 STORMWATER FOLLOW-UP INSP Correction Required SWPPP controls are still not repaired. Spoke to Jim 409-6703 explained if controls are not installed per approved SWPPP I will proceed with Citation. Jim said he get someone on it.
05/08/2008 STORMWATER FOLLOW-UP INSP Correction Required Survey equipment on site. SWPPP controls have not been repaired or replaced.
11/26/2007 STORMWATER FOLLOW-UP INSP Not ready for Inspection Contractor installed AB in roadway and formed up curb and sidewalk northside of project.
10/25/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to install SWPPP controls a long northside of project.
10/04/2007 STORMWATER FOLLOW-UP INSP Partial Approval Met super on site. Contractor address items from NOV dated 9/18/07. Contractor needs to keep all SWPPP controls in working order.
09/18/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued NOV, Contractor has 7 days to, get site in compliance with approved SWPPP and AZPDES/NPDES regulations. Gave NOV to site super Justin Chastain.
09/17/2007 STORMWATER FOLLOW-UP INSP Correction Required Controls not in working order. Contractor needs to repairs to SWPPP controls, tracking mud into street. Spoke to Justin site super, set up meeting onsite for 9/18/07 at 1000 hours.
08/27/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Stabilize area along Corona St.
2- Repair/replace SWPPP controls.
3- Install construction entrance.
08/02/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to address SWPPP around site. Silt fence down, needs to be repair/replaced. Also needs to reinstall safety barrier.
07/02/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Re-install construction entrance.
2- Clean track out from site.
3- Stake down wattle per approved drawing.
Spoke to Josh in regards to issues, via cell phone.
06/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor install security fence front of property. Contractor needs to re-install construction entrance.
05/18/2007 STORMWATER FOLLOW-UP INSP Correction Required Received complaint call from home owner. Contractor needs to:
1- Re-install SWPPP controls around perimeter of site.
2- Contractor needs to keep SWPPP and Grading drawings on site durning construction.
3- Contractor needs to install safety barrier a long sewer trench.
4- Contractor needs to keep site wet to stop dust blowing off site.
Spoke to Josh (409-6705) site super in regards to all issues. If contractor continues to work without addressing items, I will issue a Stop Work Oder.
05/15/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to replace or repair silt fence west side of project. Contractor started installing sewer line. Spoke to Josh site super in regards to.
05/04/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to replace or repair silt fence west side of project. Contractor started dumping sand on site.
02/27/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor made repairs from last inspection. More material dumped on site.
02/07/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair silt fence. Spoke to Josh in regards to silt fence and stabilizing project it has been approx 4 months since last activity.
01/10/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to make repairs to silt fencing on west side of project.
12/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to install controls around walking path.
11/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval No activity at this time.
10/23/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to:
1- Repair silt fence on west side of project.
2- Pick up trash north side of project. (blue water tape)
Contacted Josh in regards to.
10/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to repair silt fence on southwest corner of project. Spoke to Josh in regards to.
09/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Site unchanged.
08/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
08/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor address issues from last inspection. Contractor needs to address port-a-potty.
08/01/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair/replace silt fence southwest corner of property. Also basin holding water. Keep streets clean.
Called Josh via cell phone left message. Josh called back and I went over issues with him.
07/18/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair/replace stormwater controls. Spoke to Josh via cell phone in regards to.
06/16/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Contractor moving AB on site. Contractor completed 5 building pads.
06/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installed wattle on northwest corner.
05/18/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor made repairs to silt fence.
05/04/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair stormwater controls on northwest and southwest corners of project. Spoke to Josh at approx. 1040 hours. in regards to issue.
04/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval Spoke to Josh (409-6705) in regards to repairing controls on northwest side of project.
04/05/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair or replace stormwater controls on north side of project.
03/17/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install silt fence per SWPPP detail. Also looks as if contractor continues to wash street down with water truck.
Josh is out of town and talked to Jim (409-6703) in regards to issues.