Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T05BU01651
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/05/2020 | ENGINEERING PRE-CONSTRUCTION | Approved | SITE COMPLETED BY GREGG SASSY SOUTHERN ARIZONA LAND TRUST | |
08/01/2013 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY. | |
09/17/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY ON SITE. | |
09/06/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME ON SITE. | |
08/10/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY ON SITE AT THIS TIME. | |
08/06/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY. | |
07/24/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | STILL NO ACTIVITY ON SITE. | |
07/03/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY. | |
06/22/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY. | |
05/23/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME. | |
05/15/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY. | |
02/21/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME. | |
09/19/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | NO CONCERNS AT THIS TIME. | |
08/29/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME. | |
08/15/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME. | |
08/11/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY AT THIS TIME. | |
05/05/2011 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | CORRECTION NOTICE ON SITE FOR SWPPP CONTROLS AND PUNCH LIST.SEE SIRE FOR COPY. | |
04/04/2011 | ENGINEERING PRE-CONSTRUCTION | Correction Required | THIS WORK HAD BEEN PREVIOUSLY COMPLETED BUT IS CURRENTLY BACK IN NEED OF REPAIR THROUGHOUT THE SITE BEFORE IT CAN BE CLEARED. REPAIRS HAVE BEEN DISCUSSED WITH THE DEVELOPERS PERSONNEL OPN THIS DATE, AND WILL NEED TO BE IMPLEMENTED IN THE FIELD IN THE WEEK TO COME. | |
03/07/2006 | ENGINEERING PRE-CONSTRUCTION | Correction Required | Contractor needs to address: 1- Schedule pre-con meeting. 2- Repair silt fence and complete installation. 3- Install construction entrance. 4- Clean W. Corona Rd. (track out) |