Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T05BU01582

Parcel: 11707026A


Addresses:

428 S 4TH AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU01582

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
01/16/2007 STORMWATER FOLLOW-UP INSP Approved Contractor sabilized all areas.
12/22/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean alley. Track out and concrete wash out.
2- Clean washout in parking area.
3- Provide washout area for subs.
Spoke to Bob site super in regards to.
09/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to stop storing materials in alley. Talk to stucco sub.
09/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
08/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time. Contractor has not started grading parking lot.
08/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor applied stucco to building. No stormwater concerns at this time.
07/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor preping for stucco.
06/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Contractor getting ready to stucco.
06/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
05/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
05/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Contractor cleaned site.
04/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval Spoke to Bob general contractor for this site, in regards to providing the proper wash out area for painters and stucco subs. Also explained the citys SWO.
04/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
03/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
03/14/2006 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time.
02/10/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater issues at this time.
Contractor framing house. Building on the south side calls for a 10' offset per approved drawing. Actual is 7'.
01/26/2006 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater issues at this time.
01/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor poured slab. Small amout of track-out from site.
12/22/2005 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
Contractor formed up pad.
12/08/2005 STORMWATER FOLLOW-UP INSP Partial Approval Site unchanged since last inspection.
11/18/2005 STORMWATER FOLLOW-UP INSP Not ready for Inspection No Activity.