Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU01511
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2006 | GRADING - FINAL | Approved | Elizabeth reviewed reviewed doc's and gave OK to close out. | |
10/11/2006 | GRADING - FINAL | Partial Approval | Spoke to Gale in regards to who will be responsible for pumping out the burrow pit after a storm event until construction starts on the building. Gale said Rio West will keep the burrow pit pumped out. I ask her to e-mail Elizabeth letting her know. | |
10/06/2006 | GRADING - FINAL | Partial Approval | Contractor installed temp. fence around pit. Contractor supplied doc.s that need the citys engineer to approve before approval can be given. | |
08/29/2006 | GRADING - FINAL | Denied | Contractor needs to address: 1- Install temp fencing around entire perimeter of borrow area. Per the plan notes. 2- Pump out standing water in bottom of borrow pit. Per plan notes. 3- Submit Documentation per note #6 on permit card. 4- Submit letter from engineer with assement of borrow pit side slopes and borrow pit condition. 5- Submit letter from engineer on deletion of borrow pit/block B. Spoke to Rick on site. |
|
06/22/2006 | GRADING - FINAL | Not ready for Inspection | Contractor is building site with no approved drawing on site. Streets have changed from 30' to 24'. Sent out e-mail to Elizabeth for asking for direction. |