Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01511
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2006 | STORMWATER FOLLOW-UP INSP | Approved | Borrow pit. Closed per Elizabeth. | |
10/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Spoke to Brent in regards to track out from Congress to the on ramp to I-10. Brent said he had a sweeper scheduled for 10:30am and at 3:30pm. | |
09/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Install temp. fence around pit #2. Per approved drawing. (safety) 2- Install SWPPP controls northwest corner. 3- Make repairs to SWPPP controls around site as needed. 4- Contractor needs to install SWPPP controls in new disturbed areas as needed. Spoke to Brent and Gale in regards to issues, on site. |
|
08/17/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor addressed some items from last inspection, continues to work on punch list. | |
08/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Repair security fence. 2- Repair controls around catch basin northwest corner. 3- Repair gravel pad entrance. 4- Install controls northeast corner. 5- Install controls southeast corner. Around stock pile. Spoke to site super in regards to control installation. Per Mike with Granite connect to permit #T04BU02986 |
|
06/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install concrete wash out area and ensure usage. | |
05/24/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Repair/replace silt fence on northwest corner. (2nd notice) 2- Install drainage channel south side of project. Spoke to Brent site super in regards to issues. Need to watch catch basins and west side for erosion. |
|
05/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Install stormwater controls around all catch basins. 2- Repair silt fence on northwest corner of project. Spoke to Mike site super in regards to issues at approx. 1320 hours. |