Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01503
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas have been stabilized. | |
| 12/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean wash out from site, (6th notice). All other violations connected to wash out will result in Notice of Violation. Spoke to project manager in regards to. |
|
| 10/25/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep wash out cleaned up around site. | |
| 05/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor completed landscaping around perimeter of property. Basin complete. | |
| 02/08/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Keep wash out cleaned up. | |
| 01/24/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean wash out from around site. (Stucco, Dry wall) Spoke to Frank site super. | |
| 12/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor closed up wall on west side of project, now using Broadway entrance. | |
| 10/26/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to provide SWPPP controls in cath basin on Broadway Blvd. Spoke to project manager in regards to stucco sub needing to install wash out area and not washing out on ground. | |
| 08/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor address issues from last inspection. | |
| 08/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to supply subs with concrete wash out area. Also clean existing wash out around site. Spoke to Frank project manager vai cell phone (847-226-2652) in regards to issue. This is the 3rd. notice. | |
| 07/11/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
| 06/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity at this time. | |
| 06/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
| 05/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met onsite with Frank's (project manager) dad, went over problem with wash out around site. Contractor to build wash out area and keep site clean. | |
| 05/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean mason wash out around site. Spoke to Frank site super in regards to item and set up a meeting for Monday 5/29/06 at 0900. | |
| 05/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to supply proper wash out area for subs. Spoke to Frank site super in regards to issues at approx. 1356 hours. | |
| 04/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor finished screen wall east side of project. | |
| 03/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to set back up safety devices for road closer. | |
| 03/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met on site in regards to utility installation. Went over stormwater concerns with contractors. | |
| 02/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
| 02/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. No activity. | |
| 01/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
| 01/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No stormwater concerns at this time. | |
| 12/20/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. |