Date Description Inspector Results Comments
05/06/2020 STORMWATER FOLLOW-UP INSP Approved SITE APPEARS TO BE CONSTRUCTED PER THE APPROVED PLANS, NO INSPECTIONS HAVE BEEN CALLED IN SINCE 11/2007, AND NO CLOSEOUT DOCUMENTATION HAS BEEN PROVIDED BY THE ENGINEER OF RECORD FOR THIS SITE.
03/27/2012 STORMWATER FOLLOW-UP INSP Correction Required NO CONCERNS AT THIS TIME.
01/14/2009 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
-PERFORM MAINTENANCE ON WASHOUT AT WEST SIDE OF SITE
-PLACE CURBSIDE BMPS
-PERFORM MAINTENANCE ON BMP AT INLET ON STELLA
-PERFORM MAINTENANCE ON CONTROLS AT OLD WASH CROSSING
-SWEEP AT ACTIVE LOTS
-PLACE AND SIGN CONCRETE WASHOUT AT EAST SIDE OF SITE
11/26/2008 STORMWATER FOLLOW-UP INSP Correction Required SOME WORK HAS BEEN DONE FOR MAINTENANCE

MAINTENANCE NEEDED ON CONTROLS AT DROP INLET ON BRIDGE ON STELLA
10/06/2008 STORMWATER FOLLOW-UP INSP Correction Required -CLEAN OUT DIRT AND CONCRETE FROM CONCRETE WASHOUT
-SWEEP AT STELLA NW CORNER OF SITE
-CURBSIDE BMPS STILL NEEDED
10/01/2008 STORMWATER FOLLOW-UP INSP Correction Required ED CRADDOCK ON SITE
DISCUSSED PLACEMENT OF V DITCH
CLEANING OF CATCH BASIN
SWEEPING HAS BEEN DONE AT STELLA
09/23/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-PERFORM MAINTENANCE ON CONTROLS AT SCUPPER ON STELLA
-SWEEP SEDIMENT FROM STELLA AT LAKESIDE RDG LP AND LAKESIDE VIEW
-REFORM MAINTENANCE AT CATCH BASIN ON LAKESIDE VIEW
-PLACE CURBSIDE BMPS
-SWEEP SITE AND PLACE TRACK OUT ROCK AT WASHOUTS AND ROLLOFFS
08/29/2008 STORMWATER FOLLOW-UP INSP Correction Required CALLED ED CRADDOCK
CORRECTION NOTICE TO BE ADDRESSED 9/2-9/4
08/14/2008 STORMWATER FOLLOW-UP INSP Correction Required NO CHANGE IN SITE SAME OUTSTANDING ISSUES FROM 8/6
08/06/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-REMOVE SEDIMENT FROM ROADWAY AT W END OF STELLA/LAKESIDE RIDGE LOOP
-RE-ESTABLISH CURBSIDE BMPS THROUGHOUT SITE
-PROTECT/REMOVE STOCKPILE AT NW CORNER OF SITE
-REMOVE SEDIMENT AT & IN CATCHBASIN AT LAKESIDE VIEW DR
-SWEEP LAKESIDE VIEW DR
-ENSURE GOOD HOUSEKEEPING AT ACTIVE LOTS
05/19/2008 STORMWATER FOLLOW-UP INSP Correction Required SMALL STOCKPILES AROUND SITE NOT PROTECTED
NO CURBSIDE BMPS
03/11/2008 STORMWATER FOLLOW-UP INSP Partial Approval DEBRIS PICKED UP
CALLED AND TALKED TO ED CRADDOCK

ADDITIONAL ITEMS ARE BEING ADDRESSED
03/05/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE SENT
-TRACK OUT ON EAST STREET
-CONCRETE WASHOUT NOT SIGNED ON WEST SIDE
-CLEAN UP CONSTRUCTION DEBRIS ON EMPTY LOT ACROSS FROM COMPLETED HOMES
12/14/2007 STORMWATER FOLLOW-UP INSP Correction Required BREECH OF CONTROLS DURING RAIN EVENT PER ED
HE WAS NOTIFIED BY STERLING FORD (COT)
REPAIRS WERE MADE SAME DAY

NO WORK ON SITE CURRENTLY
12/07/2007 STORMWATER FOLLOW-UP INSP Correction Required SCE NEEDS TO BE ESTABLISHED
WATTLE TEMPORARILY PLACED AT CURB CUT
TALKED TO ED CRADDOCK-PROVIDED CONTACT INFO FOR STERLING FORD WITH PARKS AND REC
11/28/2007 STORMWATER FOLLOW-UP INSP Correction Required ROCK AT WEST ENTRANCE NOT SPREAD
PER ED WILL BE DONE BY 11/30
11/15/2007 STORMWATER FOLLOW-UP INSP Correction Required SWPPP CONTRACTOR ON SITE
DISCUSSED THE WATTLE IN FRONT OF INLETS ON BOX CULVERT
CALLED ED WITH TJ BEDNAR-ROCK MUST BE PLACED AT CURB CUTS (SCE) OR CONTROLS MUST BE PUT IN PLACE
11/19 REINSPECT
11/08/2007 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS NOT IN PLACE AT CURB CUTS
10/31/2007 STORMWATER FOLLOW-UP INSP Correction Required DRY UTILITIES BEING INSTALLED ON WEST SIDE
SCE NEEDS TO BE MAINTAINED OR OTHER CONTROLS PLACED AT CURB CUT
10/23/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

CLEAN UP TRACK OUT AT WEST SIDE OF SITE ONTO STELLA
PLACE ROCK IN ENTRANCE
10/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval TALKED TO ED CRADDOCK

THERE WAS A SEWER BACK 10/9 UP THAT RESULTED FROM PUTTING A CAMERA IN THE SEWER LINE FOR INSPECTION

PER ED THERE WAS NO STORWATER IMPACT AND THIS EVENT HAS BEEN LOGGED IN THE SWPPP LOG
10/02/2007 STORMWATER FOLLOW-UP INSP Correction Required PICS 2726-2728
EAST SIDE STABILILZED
SLOPES SHOW LITTLE IF ANY EROSION
WEST SIDE NEEDS MAINTENANCE OF BMPS
10/01/2007 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK COMPLETE ON EAST SIDE

CONTROLS STILL IN NEED OF MAINTENANCE
09/17/2007 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK THURSDAY
SWEEPER SCHD FOR FRIDAY
GAVE ED STERLING'S OFFICE NUMBER
09/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval BMPS APPEAR TO BE WORKING
09/06/2007 STORMWATER FOLLOW-UP INSP Partial Approval PICS 2608-2610
SEDIMENT CONTROLS APPEAR TO BE WORKING
CATCH BASIN HAS SANDBAGS INSTALLED INSIDE AT OUTLET TO CREATE A TEMPORARY SEDIMENT BASIN
OUTLET OF PIPE HAS A STRAWBALE DAM- IT APPEARS TO BE HOLDING WATER AND PREVENTING DIRECT DISCHARGE TO WASH AREA
ADDITIONALLY, VEGETATION HAS GROWN QUITE DENSE DURING RAINY SEASON AND IS WORKING WELL AS AN ADDITIONAL BARRIER BEYOND THE WATTLE
09/05/2007 STORMWATER FOLLOW-UP INSP Correction Required WALKED SITE WITH RUSSEL WITH YOUNG AND SONS CONTRACTING
CALLED ED CRADDOCK
CATCH BASIN ON EAST SIDE OF SITE IS TO HAVE SAND/GRAVEL BAGS PLACED INSIDE CB AT OUTLET PIPE TO ALLOW FOR FINES TO SETTLE BEFORE DRAINING

THERE ARE ADEQUATE CONTROLS AT OUTLET OF PIPE
STRAW BALES, WATTLE AND ABUNDANT VEGETATION APPEAR TO HAVE HELD BACK ANY PREVIOUS DISCHARGE FROM THE CATCH BASIN BEFORE IT CAN REACH THE WASH AREA AND ENTER LAKESIDE PARK
FOLLOW UP INSPECTION SCHEDULED FOR TOMORROW
09/04/2007 STORMWATER FOLLOW-UP INSP Correction Required BMPS IN NEED OF MAINTENANCE ALONG STELLA AT ENTRANCE/EXITS
08/21/2007 STORMWATER FOLLOW-UP INSP Correction Required -DIRT IN STREETS
-NEW CATCH BASIN INSTALLED NOT PROTECTED ABOVE-UNABLE TO INSPECT DUE TO HEAVY EQ TRAFFIC IN THIS AREA
08/08/2007 STORMWATER FOLLOW-UP INSP Continued DALE ON SITE WITH LABORER
CONTROLS ARE BEING REMOVED FROM WASH AREA SOUTH OF BOX CULVERT
08/06/2007 STORMWATER FOLLOW-UP INSP Correction Required NO SITE WORK DUE TO RAIN
08/03/2007 STORMWATER FOLLOW-UP INSP Correction Required SWPPP BMP WORK CONTINUING
SCUPPERS CLEANED UP AND MAINTAINED
WATTLES IN PLACE AND STAKED
-OLD WATTLES IN WASH-PER DALE TOO HEAVY AND WASH TOO WET TO ACCESS
08/02/2007 STORMWATER FOLLOW-UP INSP Correction Required MET WITH DALE ON SITE
CONTROLS BEING RE-INSTALLED
DEBRIS REMOVED FROM LAKESIDE LAKE
SWEEPER DUE 8/3
08/01/2007 STORMWATER FOLLOW-UP INSP Correction Required CALLED ED
WATTLES WASHED UP ON BEACH AT LAKE
SCUPPERS NEED TO BE DRESSED UP
SWEEPER RESCHEDULED FOR 8/3
DALE (SWPPP) SCHEDULED FOR 8/2
07/31/2007 STORMWATER FOLLOW-UP INSP Correction Required SCUPPERS NEED TO BE REDONE
CONTROLS STILL NEED WORK
SCE IN PLACE ON WEST SIDE
07/26/2007 STORMWATER FOLLOW-UP INSP Correction Required CONTROLS IN POOR SHAPE
DALE ON SITE WITH A LABORER
SCUPPERS HAVE BEEN COMPLETED ON STELLA
MAINTENANCE WORK AND REMOVAL OF CONTROLS IN PROGRESS
07/23/2007 STORMWATER FOLLOW-UP INSP Correction Required DROVE BY SITE
NO WORK HAS BEEN DONE
PER PHONE CALL FROM ED ROCK TO BE DELIVERED TODAY
CONTROLS TO HAVE MAINTENANCE THURSDAY
07/20/2007 STORMWATER FOLLOW-UP INSP Correction Required MET AND WALKED SITE WITH ED CRADDOCK
11 ITEM LIST MADE BY ED
SCEs TO BE PLACED
CONCRETE WASHOUT TO BE SIGNED
MAINTENANCE AND RELOCATION OF CONTROLS ON WEST SIDE OF WASH
CONTROLS AT SCUPPERS TO BE MAINTAINED
07/12/2007 STORMWATER FOLLOW-UP INSP Correction Required NO SWPPP CREW ON SITE
CALLED AND LEFT MESSAGE FOR ED
CALLED LARRY AND WAS ADVISED TOMORROW MORNING NO LATER THAN MONDAY MORNING CREW WILL BE ON SITE
07/11/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS HAVE NOT BEEN MADE TO SITE
LEFT MESSAGE FOR LARRY
TALKED TO ED
CREW TO BE ON SITE 7/12
06/28/2007 STORMWATER FOLLOW-UP INSP Correction Required WALKED SITE PRIOR TO 9 AM MEET
06/28/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-PLACE ROCK (SCE) AT ALL EXITS TO STELLA
-PERFORM MAINTENANCE ON ALL SEDIMENT CONTROLS
-PLACE SIGN AT CONCRETE WASHOUT
-REMOVE OLD SEDIMENT CONTROLS IN/ALONG WASH AND PLACE PER PLAN. BE SURE TO REINFORCE AT EXISTING LOW/CONCENTRATION POINTS IE AT BOX CULVERT
06/27/2007 STORMWATER FOLLOW-UP INSP Correction Required LEFT MESSAGE/INSPECTION FOR LARRY TO CALL

RESCHD SITE WALK FOR 6/28 9AM

CONCRETE WASHOUT NOT SIGNED
ROCK NOT PLACED FOR SCE
JOB TRAILER LOCKED UNABLE TO ACCESS SWPPP
PRE MONSOON WALK TO ENSURE ALL STORMWATER CONCERNS ARE ADDRESSED BEFORE START OF RAINS
06/25/2007 STORMWATER FOLLOW-UP INSP Correction Required SCE STILL NOT IN PLACE
06/12/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-SWEEP STELLA
-PLACE SCE ON WEST SIDE AND ENSURE IT IS USED
-CLEAN OUT SCUPPER LOCATIONS ON STELLA
06/07/2007 STORMWATER FOLLOW-UP INSP Correction Required ROADWAY IS DUE TO BE SWEPT 6/8 AT 2PM
06/05/2007 STORMWATER FOLLOW-UP INSP Correction Required ROADWAY NEEDS TO BE SWEPT
06/01/2007 STORMWATER FOLLOW-UP INSP Correction Required TALKED TO LARRY
SWEEPER TO BE ON SITE AFTER HOURS TODAY TO SWEEP STREET AFTER PLATING/COLD PATCH
SCUPPER PROTECTION IS IN PLACE ON BRIDGE
05/17/2007 STORMWATER FOLLOW-UP INSP Correction Required CONCRETE WASH OUT HAS BEEN STARTED
05/15/2007 STORMWATER FOLLOW-UP INSP Correction Required POSTINGS ARE UP
ROCK HAS BEEN ADDED TO WEST SCE
05/14/2007 STORMWATER FOLLOW-UP INSP Correction Required EMAIL FROM JANET RUCKMAN AND STEVE PAZ ACCEPTING THE CLEAN UP WORK DONE BY SUNSTATE SWEEPING ON STELLA SARNOFF TO PANTANO AND SOUTH ON PANTANO
05/14/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 3 DAYS PIC 2282
-POST SWPPP INFO, AZPDES, PERMIT
-SET UP AND SIGN CONCRETE WASHOUT
-CLEAN OUT DEBRIS FROM SCUPPERS ON STELLA
-ENSURE STABILIZED CONSTRUCTION ENTRANCES ARE MAINTAINED AND USED
05/11/2007 STORMWATER FOLLOW-UP INSP Correction Required WENT TO CHECK ON SITE
SCE HAS NOT BEEN EXTENDED
SWEEPING HAS NOT BEEN DONE
SAND BAG HAS BEEN REPLACED

ALL SANDBAGS AT N SCUPPER HAVE BEEN THROWN INTO LAKE AREA-TO BE FIXED TODAY
SWEEPER ON IT'S WAY TO SWEEP STELLA FROM SARNOFF TO PANTANO INTERSECTION
TALKED TO STEVE PAZ ON SITE
SEE PICS 2279-2280
05/11/2007 STORMWATER FOLLOW-UP INSP Correction Required WENT BACK BY SITE SEE PIC 2281

SCE STILL HAD NOT BEEN EXTENDED CALLED LARRY AND ASKED FOR THAT TO BE DONE
SWEEPER ON SITE
WILL CHECK WITH STEVE PAZ 5/14
05/10/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-EXTEND SCE AT WEST SIDE
-TRACK OUT ON STELLA NEEDS TO BE CLEANED
-BROKEN SAND BAG AT SCUPPER ON SOUTH SIDE OF STELLA

SEE PIC 2278
05/07/2007 STORMWATER FOLLOW-UP INSP Partial Approval STELLA IS CLOSED FOR STREET CROSSING WORK
NO WORK STARTED YET
05/04/2007 STORMWATER FOLLOW-UP INSP Partial Approval PADS ALMOST AT GRADE
SWEEPER ON SITE SWEEPING STELLA
SEWER WORK TO START 5/7 THERE WILL BE ROAD CLOSURE ON STELLA
04/16/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-PERFORM MAINTENANCE ON BMPS @ BOX CULVERT SCUPPERS
-AZPDES POSTING NEEDS TO BE REDONE/MAINTAINED
-PERFORM MAINTENANCE ON WATTLE ALONG N SIDE OF W SIDE (INSTALL PER BMP)
-STUCCO WORK ABOUT TO START-CONCRETE WASH OUT NEEDED ON SITE (SIGN POSTED)

WASH CROSSING STILL BEING USED
04/02/2007 STORMWATER FOLLOW-UP INSP Prior to 1010/1015 MAINT PERFORMED ON ALL SWPPP CONTROLS
03/28/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
PERFORM REGULAR MAINTENANCE ON ALL CONTROLS, INCLUDING:
-LENGTHEN SCE-LIMIT ACCESS ON EAST SIDE OR ADD 2ND SCE AT JOB TRAILER
-REPLACE STRAWBALES AT NW CORNER OF EAST SIDE AT WATER TANK
-REPLACE MISSING WATTLE EAST SIDE NORTH OF WASH CROSSING
-REMOVE WATTLES NORTH AND SOUTH OF WASH CROSSING
-COMPLETE CONTROLS ON EAST SIDE AT SOUTH END NEAR BERM/STOCKPILE
03/23/2007 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT NEEDS TO BE SWEPT
WATTLES IN PLACE IN FRONT OF SCUPPERS
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval POWER BEING INSTALLED INTO JOBSITE TRAILER
OVER EX AND SCREENING CONTINUES ON WEST SIDE OF SITE
02/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval TALKED TO ED
HE HAS CONTACTED WINDSWEPT
ED ASKED FOR CONTACT INFO FOR EARTHWORKERS
02/05/2007 STORMWATER FOLLOW-UP INSP Partial Approval EAST SIDE APPEARS TO BE READY FOR UTILITIES TO BE INSTALLED
OVER EX AND SCREENING ON WEST SIDE CONTINUES
01/26/2007 STORMWATER FOLLOW-UP INSP Partial Approval JOB TRAILER HAS BEEN SET ON EAST SIDE
SCREENING/OVER EX WORK CONTINUES ON WEST SIDE
01/23/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME
01/19/2007 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK CONTINUES ON WEST SIDE
01/04/2007 STORMWATER FOLLOW-UP INSP Partial Approval SPOKE TO ED
HAULING WORK COMPLETE
TRASH HAUL OFF TO CONTINUE TODAY
01/04/2007 STORMWATER FOLLOW-UP INSP Partial Approval HAUL AWAY WORK GOING ON
SOME MINOR TRACK OUT
01/03/2007 STORMWATER FOLLOW-UP INSP Partial Approval 10A SWEEPER ON SITE NO LABORERS
SOME TRACK OUT
WILL CHECK BACK LATER IN DAY TO SEE PROGRESS BY SWEEPER
01/03/2007 STORMWATER FOLLOW-UP INSP Partial Approval 1:24P
SITE WORK COMPLETE FOR DAY
SWEEPER ON SITE
12/29/2006 STORMWATER FOLLOW-UP INSP Correction Required NO WORK ON SITE
12/28/2006 STORMWATER FOLLOW-UP INSP Correction Required NO WORK ON SITE
12/27/2006 STORMWATER FOLLOW-UP INSP Correction Required -LABORERS ON SITE WITH SWEEPER
SOME TRACK OUT
pics 1862-1869
12/27/2006 STORMWATER FOLLOW-UP INSP Correction Required 12 PM VISIT
NO LABORERS ON SITE
NO SWEEPER ON SITE
NO SUPERINTENDENT ON SITE

CALLED ED
12/27/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 1870-1872
TALKED TO SHANNON ON SITE
WATER TRUCK OVER FILLING
LUBE TRUCK JUST LEFT SHOULD BE USING WATER PULL NOW INSTEAD
12/27/2006 STORMWATER FOLLOW-UP INSP Correction Required 2 PM
MET WITH SHANNON ON SITE
SWEEPER ONSITE
DISCUSSED SWPPP LOGS AND HAVING ROCK IN SCE TURNED ON A REGULAR BASIS
DISCUSSED UPDATING LOG AND KEEPING PERMITS ON SITE
12/22/2006 STORMWATER FOLLOW-UP INSP Correction Required NO WORK ACTIVITY TODAY
N SCUPPER HAS BEEN CLEANED OUT
12/21/2006 STORMWATER FOLLOW-UP INSP Correction Required 1847-1850
10 AM SWEEPER ON SITE
NO LABORERS AT INGRESS/EGRESS LOCATIONS
CALLED ED
12/21/2006 STORMWATER FOLLOW-UP INSP Correction Required 12:00
SWEEPER DUE ON SITE 1:15
LABORERS ON SITE NOW
TRACK OUT HAS STARTED
12/21/2006 STORMWATER FOLLOW-UP INSP Correction Required 2:00 MET WITH ED ON SITE
PICS 1851-1861
SWEEPER ON SITE
REQUESTED THAT SCE ROCK BE TURNED
LABORERS ARE TO CLEAN OUT SCUPPER
TUESDAY SKID STEER TO BE ON SITE BEFORE SWEEPER TO SCRAPE ROADWAY
12/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval 9 AM NO HAULING WORK
12/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval 11:50
NO HAULING WORK SOME DIRT HAS BEEN MOVED ON WEST SIDE OF WASH
12/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval HAULING WORK STARTED AGAIN
SWEEPER ON SITE AND RUNNING WITH TRUCKS
HOSE STILL LEAKING
PICS 1834-1840
12/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval HAULING WORK CONTINUING
LABORERS AT EACH ACCESS POINT SWEEPING
SWEEPER RUNNING ON SITE
PICS 1841-1844
12/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval HAULING HAS BEEN STOPPED DUE TO TRASH IN EXCAVATION AREA
12/19/2006 STORMWATER FOLLOW-UP INSP Partial Approval PICS 1845-1846
WORK ON SITE HAS ENDED FOR THE DAY
PER PHONE CALL 4:12 NO HAULING WILL HAPPEN 12/20
12/18/2006 STORMWATER FOLLOW-UP INSP Partial Approval Met with Ed Kratic on-site to review the street cleaning and install of controls at the site entrance. All items on the stop work order have been addressed, I approved them to resume hauling on 12/19/06.
We will continue to monitor site daily for tract out onto Stella Ave.
12/15/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 1812-1824
STOP WORK NOT LIFTED
-CONTINUE TO REMOVE COMPACTED DIRT/SEDIMENT FROM ROADWAY
-REMOVE WATTLES, SWEEP UP GUTTER LINE AND REPLACE WATTLES
-REPLACE MISSING AND BROKEN GRAVEL BAGS
-TURN ROCK AT WEST ENTRANCE
-EXTEND SCE TO PAVEMENT WEST ENTRANCE
-ROCK MAY NEED TO BE EXTENDED FROM WATER TANK TO SCE ON EAST SIDE

TALKED TO STERLING-POND BEING STOCKED
WATER LEVELS IE TURBIDITY, DO LEVELS, ETC ARE "ON TARGET FOR THIS SEASON"
12/14/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 1807-1811
WORK CONTINUES TO CLEAN UP ROADWAY
MET ON SITE WITH LARRY SCHROEDER (TJ BEDNAR) AND DAVE (YOUNG AND SONS)
HAUL ROAD ON EAST SIDE IS TO BE IN MIDDLE WITH TRANSPORTS DROPPING ON EITHER SIDE OF HAUL ROAD AND USING HAUL ROAD TO KNOCK DIRT OFF TIRES

SWEEPER ON SITE WORKING
SOME SCRAPING DONE
SITE NOT READY TO RESUME HAULING
12/13/2006 STORMWATER FOLLOW-UP INSP Correction Required STOP WORK STILL POSTED
PICS 1791-1803

THESE ITEMS MUST BE COMPLETED/ADDRESSED
BEFORE STOP WORK WILL BE LIFTED

-STABILIZED CONSTRUCTION ENTRANCES MUST
BE COMPLETE
-WATER TRUCK PAD UNDER WATER TANK AND PATH
TO ROADWAY MUST BE STABILIZED TO PREVENT
TRACK OUT
-COMPACTED TRACK OUT MUST BE REMOVED FROM
ROADWAY (INCLUDING POSSIBLE MANUAL REMOVAL)
-SWEEPING/SCRAPING SCHEDULE MUST BE MAINTAINED
AND INCREASED AS NEEDED
-PROVIDE COPIES OF DOCUMENTATION (PERMITS)
REQUIRED BY PIMA COUNTY AND CITY OF TUCSON
TRANSPORTATION
12/08/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 1742-1756
-ROADWAY NEEDS TO BE CLEANER
-COMPACTED TRACK OUT NOT REMOVED BY SWEEPER
-EAST STABILIZED CONSTRUCTION ENTRANCE STILL NOT COMPLETE TO ROADWAY
-TRACK OUT FROM WATER TRUCK/EQUIPMENT ALREADY THIS MORNING

CALLED LARRY W/ TJ BEDNAR AND ADVISED NO TRUCKING UNTIL ROADWAY IS CLEANED
12/08/2006 STORMWATER FOLLOW-UP INSP Correction Required PICS 1757-1780
HTI WAS HAULING
STOPPED LOADER OPERATOR AND TRUCKS

THESE ITEMS MUST BE COMPLETED/ADDRESSED BEFORE STOP WORK WILL BE LIFTED

-STABILIZED CONSTRUCTION ENTRANCES MUST BE COMPLETE
-WATER TRUCK PAD UNDER WATER TANK AND PATH TO ROADWAY MUST BE STABILIZED TO PREVENT TRACK OUT
-COMPACTED TRACK OUT MUST BE REMOVED FROM ROADWAY (INCLUDING POSSIBLE MANUAL REMOVAL)
-SWEEPING/SCRAPING SCHEDULE MUST BE MAINTAINED AND INCREASED AS NEEDED
-PROVIDE COPIES OF DOCUMENTATION (PERMITS) REQUIRED BY PIMA COUNTY AND CITY OF TUCSON TRANSPORTATION
12/07/2006 STORMWATER FOLLOW-UP INSP Correction Required MET ONSITE WITH DAVE ROBERTS
YOUNG AND SONS WAS NOTIFIED SITE WILL BE SHUT DOWN IF TRACK OUT NOT ADDRESSED
12/07/2006 STORMWATER FOLLOW-UP INSP Correction Required STOP WORK POSTED
TRACK OUT NOT ADDRESSED.
NO SWEEPER AT 10 AM NO SWEEPER AT 3PM
TRACK OUT ROCK NOT IN PLACE

MET WITH BEN NOON PDEQ
MET WITH BELLA COT DOT
12/07/2006 STORMWATER FOLLOW-UP INSP Correction Required pics 1716-1741
DROVE BY SITE
CALLED DAVE TO HAVE HIM COME MEET ON SITE
12/06/2006 STORMWATER FOLLOW-UP INSP Correction Required VISITED SITE SEVERAL TIMES
TALKED TO BUBBA HARVEY WITH HTI ABOUT KEEPING TRACK OUT DOWN-LESS WATER ON THE SITE
BUBBA IS GOING TO WORK WITH DAVE WITH YOUNG AND SONS TO GET ROAD BLADED FOR SWEEPER TRUCK
CALLED TUCSON WATER ABOUT LEAKING FIRE HYDRANT (AGAIN)
SWEEPER TRUCK WAS ONSITE AT 10:45
SWPPP CREWS ONSITE AND INSTALLED SEDIMENT CONTROLS AT SCUPPER INLETS AND AT TOP OF HEADWALL
HTI TRUCKING IS TO HAVE ADDITIONAL TRACK OUT ROCK COB TODAY AS TJ BEDNAR WAS NOT ABLE TO SECURE ROCK UNTIL FRIDAY
12/05/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 1 DAY PICS 1693-1704
-PROTECT SCUPPER ON N SIDE OF STELLA
-RE-ESTABLISH AND LENGHTEN STABILIZED CONSTRUCTION ENTRANCES BOTH SIDE OF SITE
-CONTAIN/HAVE REPAIRED LEAKING FIRE HYDRANT
-PLACE CONTROLS AT WEST SIDE OF BOX CULVERT AT HEADWALL
-SWEEP/REMOVE TRACK OUT FROM STELLA
-MAINTAIN CONTROLS AT SOUTH SCUPPER

DAVE-FOREMAN FOR YOUNG AND SONS
12/05/2006 STORMWATER FOLLOW-UP INSP Correction Required pics 1693-1704
MET ON SITE WITH ED CRADDOCK

SWEEPING SCHEDULED FOR 10 AND 3
ROCK IS SCHEDULED TO BE DELIVERED
LABORERS TO BE ON SITE 12/6
11/14/2006 STORMWATER FOLLOW-UP INSP Continued NO FURTHER SITE ACTIVITY
11/08/2006 STORMWATER FOLLOW-UP INSP Continued EQ DEMOBED OFF SITE
NO SWPPP CREW ON SITE AS REPORTED...
11/07/2006 STORMWATER FOLLOW-UP INSP Continued SITE WORK HAS STOPPED PENDING APPROVAL OF WASH CROSSING CREW TO BE ONSITE 11/8 TO MAINTAIN CONTROLS
11/03/2006 STORMWATER FOLLOW-UP INSP Continued SITE WORK HAS STOPPED PENDING APPROVAL OF WASH CROSSING
11/01/2006 STORMWATER FOLLOW-UP INSP Continued OBSERVED SITE ACTIVITY
EAST SIDE OF PROJECT APPEARS TO BE CLOSE TO NATIVE AND FILL SHOULD BE STARTING SOON
10/30/2006 STORMWATER FOLLOW-UP INSP Continued OBSERVED SITE ACTIVITY
10/27/2006 STORMWATER FOLLOW-UP INSP Continued OBSERVED SITE ACTIVITY
10/25/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE OBSERVATION
10/24/2006 STORMWATER FOLLOW-UP INSP Correction Required SITE OBSERVATION
10/18/2006 STORMWATER FOLLOW-UP INSP Correction Required WASH CROSSING MUST BE BLOCKED OFF
RESTAKE AND MAINTAIN WATTLES
10/17/2006 STORMWATER FOLLOW-UP INSP Continued VISITED SITE
10/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
DROVE BY SITE
CONTROLS APPEAR TO BE IN GOOD SHAPE
10/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval WORK CONTINUES
CONSTRUCTION FENCING AROUND SITE
NO CONCERNS
09/29/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE VISIT
09/28/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 7 DAYS

SWEEP SOUTH SIDE OF STELLA FROM SCE TO SCE
09/18/2006 STORMWATER FOLLOW-UP INSP Partial Approval SWEEPING IN ROW NOT DONE YET
DIRT WORK CONTINUING
09/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval PICS 1358-1359

STRAWBALES PLACED
WATTLE PLACED AT INLET SCUPPER
CALLED LARRY AND ADVISED WORK COMPLETED
09/13/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS TO SWPPP NOT MADE
CALLED LARRY
CALL BACK RCVD-LARRY ADVISED THAT WORK WOULD BE COMPLETE BY COB 9/14
09/11/2006 STORMWATER FOLLOW-UP INSP Correction Required MET ON SITE WITH LARRY W/ TJ BEDNAR

CORRECTION ITEMS ARE:

-Straw bales need to be placed on the East side of the Atterbury Wash at the Northwest corner of the project
-Wattle needs to be re-staked on the West side of the Atterbury Wash along the clearing limits
-Sediment controls need to be placed at the inlet scupper on the bridge between the two sides of the site
-Track out rock and sediment need to be swept off of Stella Rd
-Now that the site has dried out some, general inspection of all controls is in order
09/08/2006 STORMWATER FOLLOW-UP INSP Correction Required MET ON SITE WITH STERLING FORD AND DAVID ROBERTS REGARDING POSSIBLE STORMWATER VIOLATIONS
SEE PICS 1324-1366
09/05/2006 STORMWATER FOLLOW-UP INSP Correction Required - SWEEP ROCK OUT OF ROW/ROADWAY AREA