Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01281
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2007 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
08/01/2007 | STORMWATER FOLLOW-UP INSP | Not Applicable | No activity on site. | |
06/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity. | |
05/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor striped parking lot. Bike parking installed. | |
02/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to site super in regards to paal on northwest and southwest side (min of 24 feet) and dumpster location. Contractor to start paving on Friday. | |
02/06/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to John in regards to moving trash enclosure for access. Contractor grading around building. | |
01/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up wash out around site. Re-install controls next to entrance. Spoke to site super in regards to. | |
12/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Stake down wattle. 2- Provide wash out area for sub-contractors. 3- Contractor still has not contacted John Clark in regards to trash enclosures. I explained to John Waid this item will hold up C of O. |
|
10/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to repair security fence and stabilize east side of project. Met Jon site super on site went over issues. | |
09/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Site unchanged from last inspection. | |
08/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor completed pad and stake out. | |
07/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair silt fence and wattle on westside of project. | |
07/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor stock piling material on site. No stormwater controls installed. | |
04/18/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. | |
03/29/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity | |
03/14/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity | |
03/03/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. | |
01/18/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. |