Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU01280
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/11/2007 | GRADING - FINAL | Approved | Contractor completed work around building. Contractor still need to address weir on permit T05BU01279. | |
10/01/2007 | GRADING - FINAL | Partial Approval | Met with John Waid on site went over site for final inspection. Only problem with site is with detention basin on west side. Will need to set up meeting with Jim F. on site and go over issue. Contractor may need to provide asbuilt elev. for basin. | |
09/28/2007 | GRADING - FINAL | Partial Approval | Met John Waid on site. John provided one letter for all 3 sites from engineer in regards to Chapter XIV, section 14.2(7). | |
06/07/2007 | GRADING - FINAL | Partial Approval | Spoke to John Waid in regards to calling in final grading inspection. John to call in inspection week of 6-11-07. | |
04/18/2007 | GRADING - FINAL | Partial Approval | Contractor installed bollards in trash enclosure area. Sub installing fencing. No change to northeast corner of parking area. | |
03/20/2007 | GRADING - FINAL | Correction Required | Contractor needs to address: 1- Elev. diff. of 1 to 1.5 feet. contractor using fence (chain link) to retain material. 2- Basin not per approved drawings. (weir low, slopes steeper then 3 to 1) Spoke to John site super. Engineer will need to address revisions. |
|
01/26/2007 | GRADING - FINAL | Not ready for Inspection | Met with John went over trucated dome placement, new sidewalk installation and striping. | |
01/25/2007 | GRADING - FINAL | Not ready for Inspection | Talked to John in regards to trash enclosures needing to be moved. Set up meeting to go over items with John in his office at 0930 1/26/07. | |
11/16/2006 | GRADING - FINAL | Partial Approval | Spoke to John Waid on site in regards to trash enclosuers on site. I explained to John that he needed to contact John Clark with COT. | |
08/29/2006 | GRADING - FINAL | Partial Approval | Contractor finished installing pipeing for underground basin. Contractor starting utilitys. | |
08/10/2006 | GRADING - FINAL | Partial Approval | Contractor completed pad and stake out. | |
02/15/2006 | GRADING - FINAL | Not ready for Inspection | No activity. | |
01/31/2006 | GRADING - FINAL | Not ready for Inspection | No activity. | |
12/29/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
12/13/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
11/21/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
11/09/2005 | GRADING - FINAL | Not ready for Inspection | No actitvity |