Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T05BU01279
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/25/2007 | GRADING - FINAL | Approved | Contractor made changes to weir. | |
10/11/2007 | GRADING - FINAL | Partial Approval | Contractor laid out changes to weir. | |
10/01/2007 | GRADING - FINAL | Partial Approval | Met with John Waid on site went over site for final inspection. Only problem with site is with detention basin on west side. Will need to set up meeting with Jim F. on site and go over issue. Contractor may need to provide asbuilt elev. for basin. | |
09/28/2007 | GRADING - FINAL | Correction Required | Met John Waid on site. John provided one letter for all 3 sites from engineer in regards to Chapter XIV, section 14.2(7). | |
08/02/2007 | GRADING - FINAL | Correction Required | Spoke to John Wade in regards to wier. John needs to get dirt cleaned out of street. I also spoke to John about getting the wier design approved. | |
06/07/2007 | GRADING - FINAL | Partial Approval | Spoke to John Waid in regards to calling in final grading inspection. John to call in inspection week of 6-11-07. | |
04/18/2007 | GRADING - FINAL | Partial Approval | Contractor installed bollards in trash enclosure area. Sub installing fencing. No change to northeast corner of parking area. | |
03/20/2007 | GRADING - FINAL | Correction Required | Contractor needs to address: 1- Elev. diff. of 1 to 1.5 feet. contractor using fence (chain link) to retain material. 2- Basin not per approved drawings. (weir low, slopes steeper then 3 to 1) Spoke to John site super. Engineer will need to address revisions. |
|
01/26/2007 | GRADING - FINAL | Not ready for Inspection | Met with John went over trucated dome placement, new sidewalk installation and striping. | |
01/25/2007 | GRADING - FINAL | Not ready for Inspection | Talked to John in regards to trash enclosures needing to be moved. Set up meeting to go over items with John in his office at 0930 1/26/07. | |
11/16/2006 | GRADING - FINAL | Partial Approval | Spoke to John Waid on site in regards to trash enclosuers on site. I explained to John that he needed to contact John Clark with COT. | |
08/29/2006 | GRADING - FINAL | Partial Approval | Contractor finished installing pipeing for underground basin. Contractor starting utilitys. | |
02/15/2006 | GRADING - FINAL | Not ready for Inspection | No activity. | |
01/31/2006 | GRADING - FINAL | Not ready for Inspection | No activity. | |
12/29/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
12/13/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
11/21/2005 | GRADING - FINAL | Not ready for Inspection | No activity. | |
11/09/2005 | GRADING - FINAL | Not ready for Inspection | No activity |