Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01279
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2007 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
08/01/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | No activity on site. Contractor needs to repair wier from storm and have new design approved. | |
06/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | No activity, contractor has not repaired weir. | |
05/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor striped parking lot. Forming up north side next to fence. Bike parking installed. | |
02/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to site super in regards to paal on northwest and southwest side (min of 24 feet) and dumpster location. Contractor to start paving on Friday. | |
02/05/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to John in regards to moving trash enclosure for access. Contractor grading around building. | |
01/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up wash out around site. Re-install controls next to entrance. Spoke to site super in regards to. | |
12/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Stake down wattle. 2- Provide wash out area for sub-contractors. 3- Contractor still has not contacted John Clark in regards to trash enclosures. I explained to John Waid this item will hold up C of O. |
|
10/18/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to John in regards to moving wattle from west side to the east side of project. With basin cut in on west side controls no longer needed. | |
10/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Site unchanged from last inspection. | |
09/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make repairs to wattle on the north and west side. Spoke to Jon Wade in regards to via cell phone. | |
08/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor started installing basin pipeing. | |
08/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor completed trench, will back fill bottom of pipe zone with 3/4" to 1" drain rock. | |
07/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair silt fence and wattle on west side of project. | |
07/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor stock piling material on site no stormwater controls installed. | |
04/18/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. | |
03/29/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity | |
03/14/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity | |
03/03/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. | |
01/18/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | No activity. |