Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2005 | FRAMING | Approved | IVRS - Inspection :* | |
| 06/06/2005 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* YOU NEED TO USE PROPER NAILS FOR H2.5'S AND POST BASES & POST CAPS. THIS MEANS HANGER SCREWS OR " TICO" NAILS OR 10D COMMON NAILS ( 16D SINKER) SIMPSON DOES MAKE A SCREW FOR CLIPS. ALSO H2.5 CLIPS ARE MEANT TO BE INSTALLED AT THE FACE OF THE BEAM TO PREVENT UP LIFT. |