Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU00961
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Not ready for Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2008 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | NO ACTIVITY ON SITE, NO STORM WATER CONCERNS. WALL OPENINGS ON SOUTH SIDE NOT INSTALLED ENTRANCE OFF OF 5TH NOT PAVED. |
|
| 10/31/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SITE IS STILL UNDER A SWPPP UNTIL THE NOT IS FILLED WITH THE STATE. MOST SITE WORK COMPLETED PER GRADING PLAN HOWEVER SOME ROADWAY AND SIDE WALK LEFT TO BE DONE. |
|
| 07/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NEED TO CONTACT THE OWNER TO ADDRESS THE ITEMS LISTED BELOW AND TO GET THEM TO STABILIZE THE SITE UNTIL CONSTRUCTION IS COMPLETED: 1) DRESS UP AREA IN RIGHT-OF-WAY BETWEEN WALL AND SIDEWALK. 2) REMOVE SEDIEMNT CONTROLS IN ALL AREAS THAT THEY ARE NO LONGER BEING USED. 3) PROTECT WALL OPENING AT SW CORNER UNTIL SITE IS STABILIZED. 4) PROTECT CATCH BASIN WITH GRAVEL BAGS. |
|
| 06/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) DRESS UP AREA IN RIGHT-OF-WAY BETWEEN WALL AND SIDEWALK. 2) REMOVE SEDIEMNT CONTROLS IN ALL AREAS THAT THEY ARE NO LONGER BEING USED. 3) PROTECT WALL OPENING AT SW CORNER UNTIL SITE IS STABILIZED. 4) PROTECT CATCH BASIN WITH GRAVEL BAGS. |
|
| 05/15/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ACTIVITY ON SITE, INFRUSTRUCTURE HAS BEE SUBSTANTIALLY CONPLETED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 04/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/22/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SIGNIFICANT STORM WATER CHANGES FROM THE LAST INSPECTION ON 3/7/07 | |
| 03/07/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CUT BACK SOIL BELOW GRADE OF CURBING ALONG NORTH SIDE OF SITE. 2) REMOVE EXISTING SILT FENCE. 3) SITE ACCESS HAS BEEN PAVED, HOWEVER A SIGNIFICANT PORTION OF THE SITE IS NOT STABILIZED - SEDIMENT CONTROLS ARE STILL REQUIRED. 4) POST YOUR NOI AT ENTRANCE TO SITE. 5) PROVIDE DOCUMENTATION FOR STORM WATER SELF INSPECTIONS 6) SWEEP PUBLIC ROADWAY ROUTINELY |
|
| 02/22/2007 | STORMWATER FOLLOW-UP INSP | Violation | 1) RE-INSTALL SILT FENCE PER PLAN 2) PROVIDE A SIGNED COPY OY YOUR NOI 3) PROVIDE A STABILIZED CONSTR. ENTRANCE 4) PROVIDE STORM WATER MAINT INSPECTIONS PER PLAN COMPLY BY 2/26/07 |
|
| 02/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP TRACKED MATERIAL OFF OF 4TH STREET. 2) POST A COPY OF YOUR SIGNED NOI AT ENTRANCE TO SITE. COMPLY BY 2/14/07 NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
| 01/25/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) BLOCK WALL HAS BEEN INSTALLED ALONG THE WEST PERIMETER. 2) SILT FENCE HAS BEEN RE0INSTALLED ALONG NW CORNER CORRECT THE FOLLOWING: 3) SWEEP UP TRACKING OFF OF 4TH STREET 4) POST A COPY OF YOUR NOI AT SITE. 5) RE-ESTABLISH SILT FENCE ALONG NORTH SIDE OF SITE. |
|
| 01/11/2007 | STORMWATER FOLLOW-UP INSP | Violation | NOTICE OF VIOLATION ISSUED. FAILURE TO COMPLY WITH NPDES/AZPDES PERMIT AND APROVED SWPPP. 7 DAY COMPLIANCE. NON-COMPLIANCE WILL RESULT IN A CITATION AND A STOP WORK ORDER. 1) RE-INSTALL SEDIMENT CONTROLS ON SITE PER PLAN. 2) SWEEP UP TRACKED MATERIAL OFF OF 4TH ST 3) RE-ESTABLISH ROCK ENTRANCE. 4) POST NOI AND/OR AZPDES AUTHORIZATION NUMBER. |
|
| 12/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ACTIVITY ON SITE, WILL RESCHEDULE, RAINING. | |
| 12/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ENSTALL SEDIMENT CONTROLS AT PERIMETER OF SITE AS STARED BY YOUR APPROVED STORM WATER PLAN. 2) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAY DAILY. 3) POST A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE. 4) PROVIDE DOCUMENTATION OF REQUIRED ROUTINE STORM WATER MAINTENANCE INSPECTIONS PERFORMED ON SITE AS STATED IN YOUR SWPPP. 5) INSTALL AND USE A DESIGNATED CONCRETE WASH OUT ON SITE. COMPLY BY 2 WEEKS FRON INSPECTION DATE, NON- COMPLY WILL RESULT IN A NOV. |
|
| 11/29/2006 | STORMWATER FOLLOW-UP INSP | Prior to 1010/1015 | STORM WATER ITEMS LISTED ON THE PREVIOUS INSPECTION HAVE BEEN ADDRESSED. ASSURE STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. |
|
| 11/27/2006 | STORMWATER FOLLOW-UP INSP | Violation | TRACKING ON STREET IS BEING CLEANED UP, HOWEVER THE STABILIZED ENTRANCE FROM THE SITE NEEDS TO BE RE-INSTALLED. ALL TRACKING NEEDS TO BE CLEANED UP AND THE ROADWAY NEEDS SWEPT ROUTINELY. | |
| 11/16/2006 | STORMWATER FOLLOW-UP INSP | Violation | NOTICE OF VIOLATION WAS ISSUED. CONTRACTOR HAS TRACKED MATERIAL ONTO 4TH ST. CONTRACTOR MUST SWEEP UP TRACKING ON A ROUTINE BASIS. COMPLY BY MONDAY 11/20/06. NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER. | |
| 10/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP TRACKED MATERIAL OFF OF 4TH STREET. 2) MAINTAIN SILT FENCE AT PERIMETER. |
|
| 10/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SEE INSPECTION FOR 10-3-06, UNDER STORM WATER INSTALL OF CONTROLS. |