Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2006 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ENSURE YOUR STABILIZED ENTRANCE SITE IS MAINTAINED (ADD ROCK) ON A ROUTINE BASIS. 2) SWEEP UP TRACKED MATERIAL OFF OF 4TH ST AS NEEDED. 3) REMOVE SLACK FROM SILT FENCE, THE MORE SLACK IN FENCE, THE MORE LIKELY THE WIND WILL KNOCK IT DOWN. 4) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE OF THE SITE. 5) PERFORM PERIODIC STORM WATER MAINT. AS REQUIRED PER YOUR PLAN. |